Critter Co. / Catalina BioSolutions

Soil and Groundwater Treatment of MTBE


Project: Treated 4,200 cubic yards of petroleum contaminated sandy-silty soil and water
Client: Speedy Express Service Station
Location: Walterboro, South Carolina
Scope of work: In-Situ Bioremediation
Project cost: $30,000 (Included only microbial products)
Source of contamination: Leaking UST
Project duration: 15 months
Status: Closed

Description: A series of 2-inch diameter slotted PVC was installed to a depth of 8-10 feet. Approximately 200 gallons of our microbial and nutrient product was injected into each well: three times over a period of nine months.

Customer comments

No comments were found for Soil and Groundwater Treatment of MTBE. Be the first to comment!