Trial for 2 months Starting on 23rd Feb 2014 Readings from 1st Feb to 1st April

Primary Scope of Trial

  • Increase DO in Aerator A and B and prove the Efficiency of EcoSystem Plus

Secondary Benefits

  • Reduce TDS
  • Reduce TSE BOD & COD
  • Reduce TSE NH3, N02-N, P04-P
  • Reduce Polymer Usage

Dosing Schedule

  • Plant Capacity 6000 m3
  • Dosing 25 Liters Per Day ( 1ppm for every 100 BOD)