Environmental Remediation Contractor

Sub Slab Depressurization (SSDS) Installation- Case Study

0

Courtesy of Environmental Remediation Contractor

ERC was hired as the General Contractor to install a sub-slab depressurization system (SSDS) in a 533,000-square foot active facility.  The SSDS was designed by Hull & Associates to address the chemicals of concern (COCs) detected in the soil beneath the existing building slab. This system included trenching, installing 1,157' of horizontal pipe, vacuum blowers, 10 sub-slab extraction points, installation of vertical extraction riser connections to each extraction point and 186' of above ground piping connecting the extraction risers to the vacuum blowers.

Environmental Remediation Contractor is a force for nature. We're a contractor created to serve the environmental and civil contracting industry centered around soil and water quality. We have a stellar team with decades of experience offering the very best in project estimating, field execution and project management to allow for on time and on budget, safe results.

Customer comments

No comments were found for Sub Slab Depressurization (SSDS) Installation- Case Study. Be the first to comment!