The optimisation of building deconstruction for Department of Defense facilities: Ft. McClellan Deconstruction Project

0
- By:

Courtesy of Inderscience Publishers

This project entailed the removal of three identical WWII-era two-story wood-framed barracks buildings at Ft. McClellan Army Base, Anniston, AL, using varying degrees of hand deconstruction and mechanical/hand deconstruction, and a traditional demolition method. Deconstruction is the dismantling of building structures to recover the maximum amount of primarily reusable and secondarily recyclable materials in a safe and cost-effective manner. Each building was approximately 4500 square feet. The maximum practical materials salvage from the buildings using 100% hand deconstruction techniques was 39% of the mass by weight. A combination of hand and mechanical techniques was discovered to have approximately the same economic efficiency as 100% hand deconstruction, measured as a ratio of gross cost per salvage value, with a 44.6% reduction in total labour-hours, and a reduction of only 7% of salvage materials by weight. This paper describes the research methods and deconstruction techniques employed, and lessons-learned.

Keywords: demolition, building deconstruction, green building practice, building materials reuse, building salvage, building dismantling, wooden barracks, recycling

Customer comments

No comments were found for The optimisation of building deconstruction for Department of Defense facilities: Ft. McClellan Deconstruction Project. Be the first to comment!