The site occupied a total plan area of 0.4 hectares and was situated approximately 1 Km south of Uxbridge town centre. Historically, the site functioned as a car dealership, vehicle maintenance and MOT companies, a welding shop and a tyre fi tter from which various contamination issues had arisen. Site Investigations revealed a ‘hotspot’ of
contaminated soil towards the centre of the site with elevated concentrations of Petroleum Hydrocarbons (TPH). Groundwater was found to be contaminated with elevated levels of diesel range hydrocarbons.

Objective

The overall remediation strategy was designed to address the source and pathway contamination issues, as a measure to protect both human health and groundwater receptors. Envirotreat were awarded the Contract based on the fl exibility of the E-clay® Technology and its application for the treatment of both the contamination hot-spot and
groundwater migrating off-site, and the ability to offer the client a cost-effective solution.

Customer comments

No comments were found for Uxbridge Case Study. Be the first to comment!