Designing, production, installation, start-up and adjustment works of  WWTP (flotation unit  'Flotas', accumulation tank 50 m³, sludge tank 45 m³) for  Lindstrom laundry in Logatec, Slovenia.  Maximum flow rate per day is 210 m³/day and optimal flow rate per hour is 14 m³/h.