Wintershall project - providing Germany’s leading oil & gas supplier with a superior alternative for oil recovery - Case Study

0

Courtesy of IDE Technologies

A cost-effective, eco-friendly solution that replaced the existing conventional boiler feed water generation process for the Emlichheim Oil Field. IDE’s industrial water treatment solution has been in continuous operation since 1991, delivering 100% of the design capacity and ensuring steady, successful oil production for many years.

Overview

  • Capacity: 2400 m3/day
  • Technology: Mechanical Vapor Compression (MVC)
  • Project Type: Engineering-Procurement-Construction (EPC)
  • Location: Emlichheim Oil Field, North Germany
  • Commission Date: 1990, 1991

Highlights

Proven reliable track record:

  • Continuous successful operation for over two decades
    Technological leadership:
  • Robust horizontal design optimized for customer needs
  • Cost-effective high quality materials of construction (MoC) designed for durability
  • Inherent stability and automatic control, reducing the need for labor and maintenance, while maintaining high availability 

Environmental responsibility:

  • No additional water resources required
  • Closed loop water treatment
  • 25% lower energy consumption