12 Articles found
Aerzener Maschinenfabrik GmbH Articles
-
Aerzen hybrid specifically optimises pneumatic conveying system - Case Study
Segment: Environmental engineering Problem: Two different supply concepts need different pressures for conveying air Solution: AERZEN Delta Hybrid Result: Saving of energy and reduction of the Life Cycle Costs Pressure for all conveying ...
-
Holcim Cement Plant – Case Study
Background AERZEN, as a specialist in cement applications, improves the pneumatic conveying coal feeding system to the main burner in Holcim Colombia Plant. The plant located in Nobsa, a small town 2.5 hours away from Bogota. The plant capacity is ...
-
Milser Mühle - Case Study
When the Borgstedt Family took over the Milser Mühle 130 years ago, at first, it only produced feed material, and then, from 1918, it started to produce flour for human food. “Therefore we selected oilfree compressing AERZEN Positive ...
-
Aerzen USA, Albertville WWTP - Case Study
Segment: Environmental engineering Problem: WWTP uses fuel boilers Solution: AERZEN Biogas packages Results: Reduces operating cost by using biogas solution Background Albertville, Ala., is a small city on Sand Mountain, a 26-squaremile plateau in ...
-
Holzkirchen wastewater treatment plant - Case Study
Holzkirchen wastewater treatment plant has a clearly formulated job: “We purify our wastewater optimally.” With its wastewater treatment plant designed for a population equivalent of 50,000, the municipal enterprise, located 40 ...
-
KA Rheda-Wiedenbrueck - Case Study
If modernisations in wastewater treatment plants are due, as a rule the permanently reducing limit values of ammonium, nitrate and phosphate are pushing the investment decisions. If it concerns the budget, in view of the climate protection and the ...
-
BASF Antwerp - Case Study
BASF Antwerp is Belgium’s largest Verbund site of chemistry and is also the second largest production site ofthe BASF group worldwide. The premises, located at the harbour in Antwerp, cover an area of 600 hectares and include 54 integrated ...
-
We purify our wastewater optimally - Case Study
With AERsmart made by AERZEN Holzkirchen wastewater treatment plant saves about 50,000 kWh every year Holzkirchen wastewater treatment plant has a clearly formulated job: “We purify our wastewater optimally.” With its wastewater ...
-
Get out of cover and reduce the reserves! Efficient air for wastewater treatment plants - Case Study
AERZEN combines blower technology/ new control system for energy saving operation even in case of load changes If modernisations in wastewater treatment plants are due, as a rule the permanently reducing limit values of ammonium, nitrate and ...
-
Water supply for the city of the future - Case Study
The project SEMIZENTRAL, of the Technical University Darmstadt in the Chinese coastal metropolis of Qingdao, has been given a GreenTec Award. This project shows how to plan infrastructure as needed, and how to put these infrastructure plans into ...
-
AERZEN provides energy efficient process air generation - Case Study
Success Story - Wastewater treatment plant Ichenhausen/Koetz For process air generation, the Koetz wastewater treatment plant selected an ideal solution: the compound system of AERZEN turbo compressors for base load, and AERZEN positive ...
-
Aerzen Turbo G5plus, now with 13 sizes
New models AT75 and AT100 are now available With the new generation Aerzen Turbo G5plus, AERZEN has designed the most compact and efficient turbo machine in its class. With the two new models AT75 and AT100, available immediately, the Aerzen Turbo ...