  • Window-Film industry was literally burning money to operate its coating lines – Case Study

    Window-Film industry was literally burning money to operate its coating lines – Case Study

    Project / Case Feature Item Problem A pioneering leader in the window-film industry was literally burning money to operate its coating lines. The company produces thin solar-control laminated films used to screen UV rays, block heat, reduce glare, ...

  • Engineering a Better Way to Coat Battery Electrodes - Case Study

    Engineering a Better Way to Coat Battery Electrodes - Case Study

    Problem The traditional tandem coating process is characterized by coating and drying one side of the current collector, then re-running the foil through the entire coating and drying process for the second side of the foil. Tandem coating also ...

  • Shenzhen East Waste-to-Energy Power Plant - Case study

    Shenzhen East Waste-to-Energy Power Plant - Case study

    Babcock & Wilcox Vølund A/S (B&W Vølund), a subsidiary of The Babcock & Wilcox Company (B&W), was selected to design a waste-to-energy (WtE) boiler for Shenzhen Energy Environmental Engineering Co. Ltd. in Shenzhen, ...

  • Likeng II: Guangzhou, China Waste-to-Energy Plant - Case study

    Likeng II: Guangzhou, China Waste-to-Energy Plant - Case study

    Babcock & Wilcox Vølund’s license partner Grantop (Guangzhou Environment Protection Investment Co. Ltd.) has completed the Likeng II waste-to-energyplant in Guangzhou, China. The plant is one of the largest Chinese ...

  • Master hand hole (MHH) Plug welding recommendations - Case study

    Master hand hole (MHH) Plug welding recommendations - Case study

    Purpose This plant service bulletin advises owners and operators of B&W equipment on the recommended seal welding procedure for Master Hand Hole (MHH) plugs. Problem MHH plugs are available in carbon steel (SA-181-70) or 2!4Cr-lMo (SA-182 F22 ...

  • Lower convection pass casing enclosure and Economizer hoppers - Case study

    Lower convection pass casing enclosure and Economizer hoppers - Case study

    Purpose This plant service bulletin (I*SB) advises owners and operators to inspect the lower convection pass casing enclosure and economizer hopper supports for damage due to erosion, corrosion, excessive ash accumulation or abnormal temperature ...

  • Chemical cleaning guide - Case study

    Chemical cleaning guide - Case study

    Purpose This plant service bulletin provides guidelines to owners and operators on when to chemically clean boilers and steam generating equipment. Background Though current standard water treatment practices may be followed, the internal surfaces ...

  • Spiral bevel gear bolts - B&W Roll Wheel™ Pulverizer gearbox - Case study

    Spiral bevel gear bolts - B&W Roll Wheel™ Pulverizer gearbox - Case study

    Purpose To alert owners and operators of B&VV Roll Wheel™ pulverizers of a possible problem with the bolls on the spiral bevel gear (See Figure 1). Problem The constant cyclic loading In the B&W Roll Wheel™ gear drive may cause ...

  • UP Boiler mix stud plate cracking - Case study

    UP Boiler mix stud plate cracking - Case study

    Purpose Advise customers to inspect for cracks in wall tubes in the furnace enclosure mix areas of UP boilers that were designed prior to 1973. Several recent inspections have revealed stud plate deterioration and cracking, which has propagated into ...

  • Drain stub bore hole cracking - Case study

    Drain stub bore hole cracking - Case study

    Purpose This plant service bulletin alerts customers to inspect drain line stub bore holes for radial cracking. Problem Numerous incidents have been reported of header cracking caused by water quenching the drain line stub bore hole and header ID, ...

  • E/EL Pulverizer bottom ring lifting clamp - Case study

    E/EL Pulverizer bottom ring lifting clamp - Case study

    Purpose Alert customers on safety procedures when using the Babcock & Wilcox bottom grinding ring lifting clamp. Problem The Babcock&Wilcox lifting clamp is designed only to lift the bottom ring off the ring seating surface of the yoke and ...

  • MPS Loading Rods/Cables - Case study

    MPS Loading Rods/Cables - Case study

    Purpose Alert customers to inspect the loading rods/cables on MPS mills. Problem Several MPS pulverizers have experienced load rod/cable stud bolt failures (fatigue) at the base of the pull down eye. The stud bolt connects the loading rod/cable to ...

  • B&W Acquires Universal Acoustic & Emission Technologies, Inc.

    B&W Acquires Universal Acoustic & Emission Technologies, Inc.

    Babcock & Wilcox Enterprises, Inc. (B&W) (NYSE:BW) has acquired Universal Acoustic & Emission Technologies, Inc. (UniversalAET), a Wisconsin-based provider of custom-engineered acoustic, emission and filtration solutions, effective ...

  • Amager Bakke / Copenhill Copenhagen, Denmark - Case study

    Amager Bakke / Copenhill Copenhagen, Denmark - Case study

    Copenhagen’s state of the art plant sets new standards for environmental performance, energy production and waste treatment. Innovative technology and architecture integrate to form a future in which waste-to-energy plants are welcomed in any ...

  • Nordforbrænding: Hørsholm, Denmark Waste-to-Energy Plant - Case study

    Nordforbrænding: Hørsholm, Denmark Waste-to-Energy Plant - Case study

    The plant Nordforbrænding is owned by five municipalities (Hørsholm, Allerød, Fredensborg, Elsinore, and Rudersdal) in the northern part of Zealand in Denmark covering a population of approximately 200,000 inhabitants. ...

  • Margam, Port Talbot, South Wales Waste Wood-Fired Power Plant 40 MWe - Case study

    Margam, Port Talbot, South Wales Waste Wood-Fired Power Plant 40 MWe - Case study

    The developer Eco2 secured the site and planning consent to develop the biomass facility in Margam, Port Talbot. Following a competitive tender, Babcock & Wilcox Vølund and Interserve were awarded an EPC/turnkey contract for the facility. ...

  • Templeborough Waste Wood-Fired Plant Rotherham, South Yorkshire - Case study

    Templeborough Waste Wood-Fired Plant Rotherham, South Yorkshire - Case study

    The developer Bright Partnerships secured the site and planning consent to develop the biomass facility. Following thorough market research Babcock & Wilcox Vølund working with Interserve were awarded an EPC/turnkey contract for ...

  • Teesside Waste Wood-Fired Plant Port Clarence, England - Case study

    Teesside Waste Wood-Fired Plant Port Clarence, England - Case study

    The project developers Eco2 and Temporis Capital secured the site and planning consent to develop the Teesside biomass facility in Port Clarence. Following engagement on Eco2’s Margam biomass project in South Wales, Babcock & Wilcox ...

  • EfW at Sakra Jurong Island, Singapore - Case study

    EfW at Sakra Jurong Island, Singapore - Case study

    Together with Halla Energy & Environment and Hyundai-HEC Joint Venture we are building a new waste-to-energy plant for Sembcorp Ltd. The plant will be located in Sakra, an industrial area on the Jurong Island in Singapore. The new facility will ...

  • Lansing Generating Station, Unit 4 - Case study

    Lansing Generating Station, Unit 4 - Case study

    Alliant Energy Lansing, Iowa, USA Plant Description Pre-retrofit equipment 270 MW boiler Hot-side electrostatic precipitator (ESP) Selective catalytic reduction (SCR) Powdered activated carbon (PAC) Fabric filter Contract Order 2012 ...