25 Articles found

Articles

indicates free access

  • Water, wastewater & reuse master plan

    Water, wastewater & reuse master plan

    Client: Poinciana Utilities Inc.   Completion Date: 2000   Services Provided Master planning Customer and demand projections Water system evaluations Wastewater system evaluations Reuse system evaluations ...

  • Water treatment plant filter improvements

    Water treatment plant filter improvements

    Client: City of Junction City, Kan. Completion Date: March 2003 Services Provided Filter rehabilitation Air scour system design Construction phase services Project Summary  Burns & McDonnell provided planning, design, bidding ...

  • Water system master plan

    Water system master plan

    Client: City of Fort Smith, Ark. Completion Date: 2002 Services Provided Water supply/delivery Hydraulic modeling and design Water quality analyses Water supply hydrology Flood hydrology 3-D project rendering Physical hydraulic ...

  • Water supply planning & environmental studies

    Water supply planning & environmental studies

    Client: U.S. Fish & Wildlife Service Completion Date: 1998 Services Provided Surface water modeling Groundwater modeling Storage reservoir siting and assessment Facility modifications Water supply alternative evaluations Water ...

  • Water source development effort

    Water source development effort

    Client: City Utilities of Springfield Completion Date: June 1996 Services Provided Water source study Population projections Service area delineation Water demand projection Public involvement Capacity assessment Infrastructure ...

  • Water regionalization study

    Water regionalization study

    Client: Tri-County Regional Planning Commission Completion Date: 1992  Services Provided Master planning Water supply and distribution planning Hydraulic modeling Customer and demand projections Cost estimating Economic ...

  • Wastewater master plan - south of Missouri river

    Wastewater master plan - south of Missouri river

    Client: Kansas City, Mo.   Completion Date: 1999   Services Provided Collection system modeling Pumping station analysis Combined and sanitary sewer wet weather flow management Project Summary  Burns & McDonnell performed a master plan of ...

  • Union county aquifer restoration

    Union county aquifer restoration

    Client: Union County Water Conservation Board  Completion Date: 2003  Services Provided 65-MGD river intake Mechanically cleaned bar screen Two traveling water screens Quarter-mile-long access bridge with service deck Four 15,050 gpm ...

  • Stormwater treatment area 3/4

    Stormwater treatment area 3/4

    Restore the Everglades That`s the task the Florida Legislature set for the South Florida Water Management District. But how? Decades of development had eliminated the sheet flow of water from Lake Okeechobee. Densely populated cities and a ...

  • Statewide souce water assessment

    Statewide souce water assessment

    Client: Kansas Department of Health & Environment Completion Date: June 2003 Services Provided Program management Internet tool development GIS with data file integration Education Recruitment Training Public involvement Source ...

  • Sparta aquifer master plan

    Sparta aquifer master plan

    Client: Union County Water Conservation Board Completion Date: 2004 Services Provided Hydrogeologic modeling Evaluate alternative supplies Aquifer storage and recovery Dam and reservoir Wastewater reuse River supply Conservation ...

  • Lake Taneycomo surface water intake

    Lake Taneycomo surface water intake

    Client: City of Branson, Mo. Completion Date: 1997  Services Provided Microtunneling Public information program Permitting agency reviews Air backwash system Potassium permanganate feed system Inverted bulk drum storage ...

  • Lake supply & treatment expansion

    Lake supply & treatment expansion

    Client: City of Fort Smith Completion Date: 2003 - Design2006 - Lake construction2008 - Plant construction Services Provided Supply reservoir enlargement 30 million-gallon-per-day (MGD) water plant renovation New 20-MGD dual train water ...

  • Lake Fort Smith dam & reservoir enlargement

    Lake Fort Smith dam & reservoir enlargement

    Client: City of Lake Fort Smith, Ark.  Completion Date: 2006  Services Provided Intake tower with microtunnels Road relocation Raw water lines Outlet works Pressure reducing station Dam embankment Principal spillway Auxiliary ...

  • Integrated local water supply plan

    Integrated local water supply plan

    Client: City of Wichita, Kan. Completion Date: June 2001  Services Provided Water supply planning Evaluation of alternatives Cost estimating Economic comparison Environmental studies (NEPA) Program management Hydrogeologic ...

  • Industrial wastewater treatment plant study

    Industrial wastewater treatment plant study

    Client: Lincoln Plating Project Summary  Burns & McDonnell provided a concept study evaluation of an existing industrial wastewater treatment plant for expansion to increase capacity for future process plant growth for Lincoln Plating, Lincoln, ...

  • Industrial operations facility - Tobyhanna army depot

    Industrial operations facility - Tobyhanna army depot

    Client: U.S. Army Corps of Engineers   Completion Date: 1999  Services Provided Design charrette Facility planning Design of facility and processes Shop drawing review Engineering assistance during construction Project Summary This ...

  • Feasibility study & master plan for water supply reservoir

    Feasibility study & master plan for water supply reservoir

    Client: North Central Missouri Regional Water Commission   Completion Date: 2003  Project Summary  Burns & McDonnell completed the feasibility study and master plan for a new water supply reservoir in Sullivan County, Mo. Sullivan County and ...

  • Design-build wastewater treatment plant upgrade

    Design-build wastewater treatment plant upgrade

    Client: City of Andover   Completion Date: 1997  Services Provided Design-build Extended aeration Ultraviolet disinfection Nitrification/denitrification Effluent reuse SRF funding  When Andover officials realized the existing plant ...

  • Chemical processing facility

    Chemical processing facility

    Client: Bell Helicopter Textron Inc. Project Summary  Burns & McDonnell provided design services for the construction of a new 40,000-square-foot facility with two automated chemical processing lines at Bell Helicopter Textron Inc.`s Plant 1 in ...