Environmental Remediation Contractor

25 Articles found

Environmental Remediation Contractor Articles

indicates free access

  • Remediate former service station - Case Study

    Remediate former service station - Case Study

    ERC was hired as the General Contractor for this project to remediate the former service station.  Gasoline underground storage tanks (USTs) were previously removed however historical releases had contaminated both soil and groundwater at the ...

  • Creek Channel & Floodplain Restoration Project - Case Study

    Creek Channel & Floodplain Restoration Project - Case Study

    The ERC & Burgess & Niple team was selected as the design-build team to complete the design, permitting and construction work along Turtle Creek. The scope of work included the removal of a failing sheet pile wall, clearing and grubbing, ...

  • Sub Slab Depressurization (SSDS) Installation- Case Study

    Sub Slab Depressurization (SSDS) Installation- Case Study

    ERC was hired as the General Contractor to install a sub-slab depressurization system (SSDS) in a 533,000-square foot active facility.  The SSDS was designed by Hull & Associates to address the chemicals of concern (COCs) detected in the ...

  • Dam Removal- Case Study

    Dam Removal- Case Study

    The Tait Station Low Head Dam located in the Great Miami River in downtown Dayton, Ohio was constructed in 1935 to supply cooling water as part of coal-fired electric generating power plant (Tait Station).  To increase recreational use, ...

  • Former Manufacturing Facility Remediation- Case Study

    Former Manufacturing Facility Remediation- Case Study

    ERC was hired as the General Contractor to remediate a former manufacturing facility in central Ohio.  Basic geology of the site was ground surface to 4 to 6 feet bgs silts and clays followed by sand and gravel to the top of the water table at ...

  • Soil Mixing- Case Study

    Soil Mixing- Case Study

    ERC was hired as the General Contractor for this project to treat organic contaminants found in the soil via in-situ chemical oxidation (ISCO).  To achieve this ERC excavated and stockpiled 2’ of overburden soils from the treatment area ...

  • Dam Restoration- Case Study

    Dam Restoration- Case Study

    ERC was hired as the General Contractor to complete the restoration of the Minerva Park Lake Dam.  The scope of work included dewatering a 6 acre lake.  Demolition of outfall and lake structures, excavation of 6,000 tons of soil and the ...

  • Air sparge system - Case Study

    Air sparge system - Case Study

    ERC was contracted to install an air sparge system in Central Ohio. Air sparging is an in situ remedial technology that reduces concentrations of volatile constituents in petroleum hydrocarbons adsorbed to soils and dissolved in groundwater. This ...

  • Wet Prairie Restoration & Created Wetland - Case Study

    Wet Prairie Restoration & Created Wetland - Case Study

    ERC was hired by the Columbus & Franklin County Metro Parks to restore approximately 75 acres of wetland habitat within a 150year-old farm field. This project included the installation of sediment & erosion controls followed by an extensive ...

  • River Stabilization & Realignment- Case Study

    River Stabilization & Realignment- Case Study

    ERC was hired as the General Contractor to stabilize and realign the North Fork Licking River immediately upstream from a rail road bridge. The project required clearing, grubbing, excavation and regrading of the existing point bars to realign the ...

  • SSDS Installation; Pontiac, Michigan - Case study

    SSDS Installation; Pontiac, Michigan - Case study

    ENVIRONMENTAL REMEDIATION CONTRACTOR  was hired as the General Contractor to install a sub-slab depressurization system (SSDS) in a 533,000 square foot active facility. The SSDS was designed by Hull & Associates to address the chemicals of ...

    Chris Mcgovern

  • Creek Channel & Floodplain Restoration Project - Case Study

    Creek Channel & Floodplain Restoration Project - Case Study

    The Environmental Remediation Contractor and Burgess & Niple team was selected as the design-build team to complete the design, permitting and construction work along Turtle Creek. The scope of work included the removal of a failing sheet pile ...

    Chris Mcgovern

  • Low-Head Dam Removal; Dayton, Ohio - Case study

    Low-Head Dam Removal; Dayton, Ohio - Case study

    The Tait Station Low Head Dam located in the Great Miami River in downtown Dayton, Ohio was constructed in 1935 to supply cooling water as part of coal-fired electric generating power plant (Tait Station). To increase recreational use, riverfront ...

    Chris Mcgovern

  • Creek Headwaters Restoration - Case study

    Creek Headwaters Restoration - Case study

    ERC was hired by the Village of Madison, Ohio to repair and restore a portion of Arcola Creek. The project consisted of grading and sloping, installing rock structures and features, installing log structures and root wads. Another large component of ...

    Chris Mcgovern

  • Property demolition & remediation project - Case study

    Property demolition & remediation project - Case study

    ERC was hired as the General Contractor for this project. We hired and managed several subcontractors for Demolition, Concrete Crushing, Surveying, Compaction Testing, Asbestos & Universal Waste. ERC self-performed the in-situ soil mixing, waste ...

    Chris Mcgovern

  • Stream restoration - Case study

    Stream restoration - Case study

    Environmental Remediation Contractor was hired as the Environmental General Contractor to restore Fetter’s Run Park in Lancaster, Ohio. This involved clearing & grubbing land adjacent to the stream. We did Demolition of an existing bike ...

    Chris Mcgovern

  • Stream restoration - Case study

    Stream restoration - Case study

    ERC was hired as the General Contractor for the stream restoration of Mill Creek in South Western Ohio. Our scope of work included the construction of one (1) riffle, rock toe, buried grade control, grading, and complete site stream restoration. ...

    Chris Mcgovern

  • Landfill 1, 2 & 3 repair - Case study

    Landfill 1, 2 & 3 repair - Case study

    ERC was hired as the General Contractor to perform repairs at 3 landfills in Tennessee for Johns Manville. The project consisted of replacing the leachate sprinkler systems, the leachate collection piping and lift stations, installing new landfill ...

    Chris Mcgovern

  • Sinkhole & stream restoration - Case study

    Sinkhole & stream restoration - Case study

    Removal of 800 CY of trash and debris from a sinkhole in the golf course and fixing the issue by installing a trash collection structure. Over 2200 LF of Stream Restoration. Placement of over 500 Boulders ranging from 46″ x 36″ to 24″ x 12″ ...

    Chris Mcgovern

  • Ohio Department of Natural Resources (ODNR) Minerals Division - Case Study

    Ohio Department of Natural Resources (ODNR) Minerals Division - Case Study

    Voorhees Highwall – Columbiana County, Ohio Fix and repair unsafe conditions at a prior strip mine in Ohio. Moved 50,000 cubic yards of fill, dewatered the site, and cleared 9 acres. Restored the area with erosion control systems, and added ...