Huckbody Environmental

10 Articles found

Articles

indicates free access

  • Azerbaijan National Water Supply and Sanitation Project

    Azerbaijan National Water Supply and Sanitation Project

    The water supply and sewer system in Azerbaijan is characterized by old, damaged and largely dysfunctional infrastructure and is financial constrained and poorly operated. This results in the level and the quality of the water supply and wastewater ...

  • Qatar-Bahrain Causeway

    Qatar-Bahrain Causeway

    Huckbody Environmental was commissioned by the Qatar-Bahrain Causeway Consortium (QBCC) and COWI to provide expert input to the EIAs and Environmental Management Plans (EMPs) for the 40km embankment and bridge crossing between Qatar and Bahrain; the ...

  • Serbia Highway Project, Corridor X

    Serbia Highway Project, Corridor X

    Huckbody Environmental has been commissioned by the World Bank to manage preparation of EIAs and EMPs for two corridors covering 150km of new and improved motorways (E75 and E80) in the south and south east of Serbia. The integration of the Serbian ...

  • SW Highway Resettlement Action Plan

    SW Highway Resettlement Action Plan

    Huckbody Environmental extended the services provided to the World Bank for the SW Highway Project in Kazakhstan by preparing the Resettlement Action Plan (RAP). The RAP preparation included discussions with the Committee for Roads (Ministry of ...

  • SW Highway Kazakhstan

    SW Highway Kazakhstan

    Huckbody Environmental provided environmental management input for the World Bank for the ESIA to upgrade 1100km of highway, part of the $3 billion investment of the road from China to Russia. Andy Huckbody was the primary author of the ESIA ...

  • Egypt Cairo Oil Refinery ESIA

    Egypt Cairo Oil Refinery ESIA

    Huckbody Environmental was commissioned by Worley Parsons and the Egyptian Refinery Company (ERC) to Project Manage the expansive ESIA for the proposed new $3 billion oil refinery in the Mostorod District of Cairo in Egypt. ERC will purchase from ...

  • M4 relief Road

    M4 relief Road

    Huckbody Environmental provided oversight and technical advice to ARUP, on behalf of the National Assembly for Wales, as part of the EIA for the proposed motorway scheme. Inputs included review of the design and EIA work undertaken for the Public ...

  • Russia, Rostov-on-Don

    Russia, Rostov-on-Don

    Huckbody Environmental provided environmental management input to ARUP for a Master Plan development in Rostov-on-Don in Southern Russia. Various development options were evaluated, including a mix of commercial and residential developments. Water ...

  • BP/BTC Pipeline Project

    BP/BTC Pipeline Project

    The Baku-Tbilisi-Ceyhan pipeline is a 1,768 kilometres (1,099 mi) long crude oil pipeline from the Azeri-Chirag-Guneshli oil field in the Caspian Sea to the Mediterranean Sea. It connects Baku, the capital of Azerbaijan; Tbilisi, the capital of ...

  • Jamuna Multipurpose Bridge

    Jamuna Multipurpose Bridge

    From 1996-1998 Andy was the Environmental Manager for the Management Consultants and Senior Environmental Adviser to the Government of Bangladesh for the project. Bangabandhu Bridge, also called the Jamuna Multi-purpose Bridge (Jomuna Bohumukhi ...