7 Articles found
NIVUS GmbH Articles
-
Determination of Flow Rates in part-filled Applications using the Radar Method
Introduction The radar measurement method plays an increasingly important role in the water and wastewater field. This is particularly reflected by the "Metering outside of the medium" trend. Flow measurement using radar which enables contactless ...
-
Flow Rate Measurement in Full Pipes Using the Transit Time Method
Particularly in large diameters the relevance of water volume measurement is growing. The challenge with cooling water or fresh water processes is to generate accurate flow recordings or to document and to control individual consumptions and ...
-
Replacement of Defective EMF - Case Study
Application Steel cast pipe with 700 mm diameter Full filled Existing EMF in pipeline defective Definition of tasks Cost-efficient installation of the new flow measurement Defective EMF should not be removed if possible (costs) No ...
-
Calibration using 5 flow sensors saves the effort of extensive reconstruction measures
"Abwasserzweckverband Breisgauer Bucht", a municipal association for sewage treatment in the south of Germany, operates a central wastewater treatment plant for its members (29 communities and cities). The WWTP covers a catchment area of 650km² ...
-
NivuFlow 750 - Transmitter with intuitive operation
NivuFlow 750 is the successor to the well-known OCM Pro CF. The compact dimensions of the new transmitter allow to install the unit on DIN rails and in switching cabinets even under confined conditions. The connecting options using plug-in ...
-
NIVUS Pipe Sensor vs. Mag Meter
The benefits of using our solution are numerous, in terms of ease of use, accuracy, cost, time and low carbon footprint so to offer a direct comparison to the usual time and cost implications of traditional Mag Meter replacement water companies ...
-
Heat From Wastewater
When it comes to using wastewater heat from channels, provision and evaluation of hydraulic and thermal wastewater data is urgently needed prior to planning and implementation of facilities. Knowing the wastewater temperatures as well as the flow ...