  • Lahti, Finland Project - Case Study

    Lahti, Finland Project - Case Study

    Lahti Energia in Finland is now building a new 150 MW biomass fired boiler.   For this project Radscan shall deliver complete condensation plant including combustion air humidification, condensate polishing and make-up water treatment. ...

  • Rzeszow, Poland Project - Case Study

    Rzeszow, Poland Project - Case Study

    A new waste incineration plant in Rzeszów delivered by Termomecanicca / Astaldi consortium as a general contractor. It will be complemented by Radscan`s installation. This is the first such a plant in Poland where waste incineration is ...

  • Odense, Denmark Project - Case Study

    Odense, Denmark Project - Case Study

    Fjernvarme Fyn A/S upgrades its existing waste incineration plant in Odense, Denmark - with flue gas condensation. Two FGC lines with double stage flue gas condensers and an absorption heat pumps are to be delivered by Radscan. Installation ...

  • Skaerbaek, Denmark Project - Case Study

    Skaerbaek, Denmark Project - Case Study

    DONG Energy invests in a new biomass powered plant in Skaerbaek, Denmark. The plant is 2 x 140 MW. Radscan delivers flue gas condensation, environmental measuring systems and condensate purification with membrane technology. Installation Starting ...

  • Värtan Kvv8 Project - Case Study

    Värtan Kvv8 Project - Case Study

    Fortum Värme new plant - KVV8 at Värtaverket in Stockholm, with its 345MW is to our knowledge the largest biomass-fired boiler equipped with flue gas condensation. In favourable operating conditions a whopping 100 MW heat can be ...

  • Brista Project - Case Study

    Brista Project - Case Study

    Fortum Värme invests in new condensate cleaning to Bristaverket Block 1. Radscan delivers condensate purification with membrane technology and a quench for improved flue gas cleaning. The plant is put into operation in autumn 2014.

  • Värtan KVV6 Project - Case Study

    Värtan KVV6 Project - Case Study

    At the turn of 2007/2008 a contract was signed with Fortum Värme AB for delivery of a complete flue gas condensation plant to KVV6 in Värtaverket. There are two coal paste boilers of 140 MW each with relatively low moisture content so ...