Installation and Maintenance Instructions for 0.75mm Wide Bore Capillary Columns

These instructions cover instrument preparation, ferrule, and column installation, leak checking, gas flow setting procedures, and maintenance requirements for 0.75mm wide bore capillary columns in packed column (equipped with capillary column conversion hardware) and capillary column GC systems. This information and your instrument’s ...