chlorinated solvents remediation Downloads

  • Chlorinated Solvent Remediation Technologies

    Object MovedThis document may be found ...

  • Bedford, MA - Naval Weapons Industrial Reserve Plant Brochure

    Phone: 425.396.4266 dfleming@thermalrs.comTRS NWIRP ProjEx 010413 acf 1 Full Scale Remediation of Chlorinated Solvents and BTEX using ERH, Naval Weapons Industrial Reserve Plant, Bedford, Massachusetts This project involved simultaneous remediation of chlorinated solvents and benzene at two separate locations called Site 3 and Site 4 at the Naval Weapons Industrial Reserve Plant ...

  • Completed Projects and Case Studies Brochure

    COMPLETED PROJECTS AND CASE STUDIESIndirect Thermal Desorption10/11/2011 RLC Technologies, Inc. 1Major Projects (1 of 2)10/11/2011 RLC Technologies, Inc. 2Project NameGeneralContractorOwner / Address Contaminants YearOn-site Thermal Remediation of Soils - Allied-Signal, East Rutherford, NJSmith TechnologyNew JerseyAllied-SignalMorristown, NJPCB's, PAH's 1995On-site Thermal Remediation of ...

  • In Situ Permeable Reactive Barriers Brochure

    In Situ Permeable Reactive BarriersGeoSierraGeoSierraResidence Time (hours)IRON REACTIVE WALL07000100020003000400050006000LIRON REACTIVETCE1,1,1-TCA1,1,1-TCAVCVCVCVC04862Concentration(ppb)In Situ Permeable BarriersIn situ reactive barriers, i.e. treatment walls, are replacingpump and treat remedies for contaminated groundwater withcost savings greater than 75%. Iron reactive permeable ...

  • Eastern Pennsylvania - TCE Remediation in Deep Bedrock Brochure

    Eastern Pennsylvania Bedrock Site TCE Remediation in Deep Bedrock Confidential Client – Eastern Pennsylvania Project Summary TRS Group (TRS) implemented an electrical resistance heating (ERH) remedy to remove trichloroethylene (TCE) in a 90-foot thick rock sequence at a confidential site in eastern Pennsylvania. This marks the first time that anyone has applied the technology in ...

  • Call for Papers

    A&WMA Specialty Conference on Vapor Intrusion, Remediation and Site Closure The Drive to Site Closure: Critical Sustainability Concerns and Key Technical Issues The Air and Waste Management Association (A&WMA) is pleased to announce a call for papers for a specialty conference on important technical considerations involving the vapor intrusion (VI) pathway, site remediation and advancing the ...

  • Methods to Accelerate Site Closure

    The Problem Is your current remedial alternative not meeting your site closure goals? Have you been performing monitored natural attenuation (MNA) for years without seeing any results? Are you tired of paying year after year for Long Term Monitoring (LTM) at your site? Have you ever wondered how long it will actually take or how much it will cost to close your site? How We Can Help • MNA ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you