groundwater monitoring pipe Downloads

  • Premium

    Groundwater Monitoring Pipes: traditional

    P2.01GROUNDWATER MONITORING PIPESThe quality of soil water monitoring systemsdepends on many factors. Firstly, only legally permitted materials should be used, as it is knownthat some existing materials contaminate soil andenvironment. Secondly, if application of certainmaterials causes contaminated water samples, thequality of the monitoring system is affected, leading to unsatisfactory analysis ...

  • Passive Soil Gas Surveys - Groundwater and PSG Correlation Brochure

    Proceedings of the Sixth International Battelle Conference: Remediation of Chlorinated and Recalcitrant Compounds Monterey, California May 19-22, 2008 Groundwater Plume, Source and Risk Identification Using Passive Soil Gas Joseph E. Odencrantz (joe.odencrantz@beacon-usa.com) and Harry O'Neill (Beacon Environmental Services, Bel Air, Maryland, USA) ABSTRACT: The results from sixty passive ...

  • Groundwater Multi-Level Monitoring Systems - Brochure

    Groundwater Multi-Level Monitoring Systems• Groundwater Monitoring• Groundwater Sampling• Hydraulic Testing for Determining Aquifer ParametersOverview Groundwater Multi-Level Monitoring SystemsHMPSHybrid Multi-PackerSystemMonitoring and sampling (1,3,4* )Stainless steelSP -16.5 mm / L-4 or 3 mm 4 / 7 / 1076 / 96 / 130 mm~ 1500 msmall diameter pump ~ 0.2 l /minyesyesHard rockPacker ...

  • Condition Assessment of Sewer Force Mains Brochure

    Strengthening of a 72-inch sewer force mainPIPELINE INSPECTIONwww.puretechltd.com Toll-free: 1-855-280-PURE (7873)Calgary, Alberta (Head Office)3rd Floor, 705 - 11 Avenue SW Calgary, Alberta, Canada T2R 0E3(403) 266-6794Columbia, Maryland 8920 State Route 108, Suite D Columbia, Maryland, USA 21045(443) 766-7873Assessing Sewer Force MainsPure Technologies provides innovative solutions to ...

  • Sub-Slab Monitoring Well Access Approach Designed Using Modified FLUTe™ Liner System by Jessica Raphael, P.E.

    RedevelopmentBuildingFoundationVaultGroundSurfaceMonitoringWellModified FLUTe™Liner SystemGroundwater ub-Slab Monitoring Well Access Approach Designed Using Modi? ed FLUTe™ Liner SystemUsing Modi? ed FLUTe™ Liner SystemKevin Murdock, PE, RG (CH2M HILL, Phoenix, AZ) Jennifer Whitney (CH2M HILL, Okemos, MI) ABSTRACTAs property owners and developers seek out opportunities for brown? elds ...

  • Multi-level Sampling Well

    As a fundamental objective of detailed geoenvironmental investiga-TMtions, IEG Multi-level Sampling Well systems allow a very detailed three-dimensional soil and groundwater contamination profile to be developed. The system is capable of recovering multiple, high-quality samples of both soil vapour and groundwater simultaneously from numerous packer-isolated horizons in a single standard ...

  • Piezopress System (PZP) - Brochure

    Focus-informationGeotechnology Hydrogeology Monitor ingPore pressure measurement with retrievable pressure sensorsTypical applicationsSolexperts' services Features of the systemPiezopress SystemGeotechnology / Hydrogeology >> Groundwater monitoring• Technical advice for the realisation of the measuring concepts• Con? guration, sale and installation of the Piezopress systems• Sale or leasing of ...

  • GWS Environmental Contractors Inc. Steam Project Description

    GWS Environmental Contractors, Inc. ------------------------ Environmental Remediation Specialists ------------------------ Tank Removals, Mold Remediation, Water Damage, Structural Drying 105 Fresh Ponds Road www.gwscontractors.com Phone: (732) 297-4847 Jamesburg, NJ 08831 Fax: (732) 297-4389 NJDEP License # US330445 PROJECT DESCRIPTION FOR SOIL VAPOR ...

  • Bedford, MA - Naval Weapons Industrial Reserve Plant Brochure

    Phone: 425.396.4266 dfleming@thermalrs.comTRS NWIRP ProjEx 010413 acf 1 Full Scale Remediation of Chlorinated Solvents and BTEX using ERH, Naval Weapons Industrial Reserve Plant, Bedford, Massachusetts This project involved simultaneous remediation of chlorinated solvents and benzene at two separate locations called Site 3 and Site 4 at the Naval Weapons Industrial Reserve Plant ...

  • "Liquid Rock" - Managing Water Hardness

    WAT Australia Pty. Ltd. P.O. Box 1353 www.wataustralia.com East Victoria Park, W.A. 6981 info@wataustralia.com Western Australia tel : +61 8 9467 9826 Application Note CALSTAT RO-30 “Liquid Rock” –Scale Formation from Ground Water Hardness The Problem Groundwater bores are essential throughout Australia. Water supplies are compromised by rapid scale build-up, an ...

  • Profound - Model BAT - Groundwater Monitoring System Brochure

    Profound IS – Geotechnical Monitoring BAT-sensor Groundwater monitoring and testing Profound BAT-sensor (ISB.0020X) The BAT-sensor combined with the BAT-filter tip measures accurately and against low costs the pore pressure in the ground. This unique, re-usable sensor is equipped with a 24-bit AD converter, microprocessor, clock, network controller and memory chip. Without difficult ...

  • "Liquid Rock" - Calstat RO-30

    WAT Australia Pty. Ltd. P.O. Box 1353 www.wataustralia.com East Victoria Park, W.A. 6981 info@wataustralia.com Western Australia tel : +61 8 9467 9826 Application Note CALSTAT RO-30 “Liquid Rock” –Scale Formation from Ground Water Hardness The Problem Groundwater bores are essential throughout Australia. Water supplies are compromised by rapid scale build-up, an undesirable circumstance in ...

  • Rapid Revitalization of a Dye Manufacturing Facility by Implementing Simultaneous Remediation/Redevelopment Activities

    Property Reuse Prior to Remedial Site Closure: Overcoming the Obstaclesapid Revitalization of a Dye Manufacturing Facility by Implementing Simultaneous Remediation/Redevelopment ActivitiesMichael Whitney / CH2M HILL Cynthia DiSante / CH2M HILL Robert Cipolletti / CH2M HILL Jennifer Whitney/CH2M HILL Robert Casselberry, Jr. / Rohm and HaasPROJECT GOALPrepare the Site for redevelopment ...

  • Geotechnical Engineering Services

    Building Trust. Engineering Success.Geotechnical Engineering Services? Earth Support Systems? Ground Improvement? Foundation Systems? Earthwork Strategies ? Construction Support? Instrumentation & Analysiswww.sanbornhead.comGEOTECHNICAL ENGINEERING SERVICESSanborn Head believes that a solid foundation is essential for successful site development. It is our experience that the subsurface ...

  • Edgemere, NY Brochure

    EDG10 ShortV ProjEx 071212 acf Guaranteed Remediation of TCE DNAPL Confidential Client – Queens, NY Project Summary TRS Group, Inc. (TRS) completed a Guaranteed Fixed Price Remediation (GFPR) with performance incentives of trichloroethene (TCE) DNAPL in both soil and groundwater in Queens, New York. The goals of the ERH remediation system were to achieve analyte-specific cleanup ...

  • Fort Worth, Texas - Air Force Plant 4 Brochure

    As a subcontractor to URS Corp., TRS designed, installed and operated a full-scale Electrical Resistance Heating (ERH) remediation system covering an area of about 1/2 acre inside Building 181 at Air Force Plant 4 in Fort Worth, TX. This is the most complex application of ERH ever com-pleted inside and underneath an operating, heavy industrial manufacturing facility. The cleanup objectives for ...

  • Water Resources Services Brochure

    Building Trust. Engineering Success.Water ResourcesSanborn Head believes that water is the critical resource linkingtogether all human activities, and that the safe and appropriatemanagement of this resource is the key to our shared future. We have extensive experience in the evaluation, development,and protection of water supplies for a broad range of projectscompleted for Fortune 500 companies, ...

  • Hydroguard Brochure

    HYDROGUARD® SYSTEMF O R U N D E R G R O U N D S T O R A G E Yesterday, plagued by corrosion leaks inherent in underground steel tanks, many of the country’s largest oil companies were simply looking for a safe and affordable solution forstoring petroleum fuels. We met those early challenges by designing, and manufacturing the first single-wall fiberglass tank. In 1965, single-wall technology ...

  • Small Diameter Well Products “Cheat Sheet” (PDF 125 KB)

    PrePak Well Screen65 mesh stainless steel screen over 0.010” slotted PVC w/ 20x40 filter sand between.3/4” Pipe Size 2.5, 5 0.81 / 1.4 2, 2-1/8 SS Mesh/Sand/Slotted PVC 2% Fine Sand1” Pipe Size 2.5, 5 1.03 / 1.7 3-1/4, 3-1/2 SS Mesh/Sand/Slotted PVC 2% Fine Sand1-1/4” Pipe Size 2.5, 5 1.34 / 2.4 3-1/4, 3-1/2 SS Mesh/Sand/Slotted PVC 2% Fine Sand1-1/2” Pipe Size 2.5, 5 1.59 / 2.4 3-1/4, 3-1/2 SS ...

  • Model 615 Drive-Point Piezometer Brochure

    Drive-Point PiezometersModel 615 Data SheetApplicationsGroundwater sampling, including VOCsWater level monitoringBase flow monitoring in stream bedsContaminant plume delineationsSoil gas samplingUST monitoringLow cost and minimal disturbance site assessmentSparge pointsHigh Quality Groundwater and Surface WaterModel 615 Drive-Pointand Shielded Drive-Point PiezometerInstalling Piezometers with ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you