remediation contract Downloads

  • Fort Wayne, IN - Brownfield Cleanup of TCE Source Area Brochure

    Source Area Remediation of TCE in Soil and GroundwaterFort Wayne, IndianaTRS Group, Inc. (TRS) was retained by Clayton Group Serv-ices to perform an Electrical Resistance Heating (ERH) re-mediation of trichloroethene (TCE) in soil and groundwater. The guaranteed remediation contract required both the baseline TCE mass in soil and groundwater to be reduced by 90% and 1,588,000 kilowatt-hours ...

  • Full brochure of events

    16 ReachCentrum – 6 Avenue E. van Nieuwenhuyse - B-1160 Brussels - Belgium - Tel +32 2 676 7400 - info@reachcentrum.eu - www.reachcentrum.eu ReachCentrum – 6 Avenue E. van Nieuwenhuyse - B-1160 Brussels - Belgium - Tel +32 2 676 7400 - info@reachcentrum.eu - www.reachcentrum.eu CATALOGUE OF EVENTS In association with ZIETA TECHNOLOGIES WHAT DO YOU NEED TO COMPLY WITH REACH 2 ...

  • Brochure ReachCentrum events

    16 ReachCentrum – 6 Avenue E. van Nieuwenhuyse - B-1160 Brussels - Belgium - Tel +32 2 676 7400 - info@reachcentrum.eu - www.reachcentrum.eu ReachCentrum – 6 Avenue E. van Nieuwenhuyse - B-1160 Brussels - Belgium - Tel +32 2 676 7400 - info@reachcentrum.eu - www.reachcentrum.eu CATALOGUE OF EVENTS In association with ZIETA TECHNOLOGIES WHAT DO YOU NEED TO COMPLY WITH ...

  • Liability Management Brochure

    We develop and safely execute contracts under diverse scenarios. Our flexibility to combine approaches and pricing mechanisms yields the greatest benefit to contract stakeholders.Liability transfer of existing regulatory obligations with firm cost-to-closure pricingCost-to-closure to achieve no further action approvalPay-for-performance for a specific scope of workCost-to-objective based on ...

  • Environmental Due Diligence Brochure

    Company Profile Ejlskov Consult A/S provides all planning including outlined and detailed design for any due diligence service and the nec-essary contact to or liaison with the authorities. We can assist you in bringing permits and approvals up-to-date, implement management of both environmental and health & safety improvements. The client is always at the cen-tre of our focus, and we ...

  • Eastern Pennsylvania - TCE Remediation in Deep Bedrock Brochure

    Eastern Pennsylvania Bedrock Site TCE Remediation in Deep Bedrock Confidential Client – Eastern Pennsylvania Project Summary TRS Group (TRS) implemented an electrical resistance heating (ERH) remedy to remove trichloroethylene (TCE) in a 90-foot thick rock sequence at a confidential site in eastern Pennsylvania. This marks the first time that anyone has applied the technology in ...

  • Bedford, MA - Naval Weapons Industrial Reserve Plant Brochure

    Phone: 425.396.4266 dfleming@thermalrs.comTRS NWIRP ProjEx 010413 acf 1 Full Scale Remediation of Chlorinated Solvents and BTEX using ERH, Naval Weapons Industrial Reserve Plant, Bedford, Massachusetts This project involved simultaneous remediation of chlorinated solvents and benzene at two separate locations called Site 3 and Site 4 at the Naval Weapons Industrial Reserve Plant ...

  • DTD Long SOQ

    Statement of Qualifications for Design and Installation of Horizontal Remediation Systems Providing Services World-Wide East Coast Office West Coast Office 100 Rolling Ridge Drive 8700 Hwy 3 SW Bellefonte, PA 16823 Bremerton, WA. 98312 Phone: 800-239-5950 Phone: 360-674-2180 FAX: 814-355-7231 Fax: 814-355-7231 Toll-Free: 800-239-5950 www.horizontaldrill.com II CONTENTS ...

  • Remediation - Total Chemical Management

    ????????????? Based on the requirements for the project, USP developed the following total chemical management program to meet project schedules and budget objectives: Site Analysis and Hazards Review USP engineering personnel worked closely with the remediation contractor to evaluate and plan for the specific hazards of the project site. Equipment was selected to ...

  • NY ISCO Remediation Case Study

    ?????????????? Based on the requirements for the project, USP developed the following total chemical management program to meet project schedules and budget objectives: Site Analysis and Hazards Review USP engineering personnel worked closely with the remediation contractor to evaluate and plan for the specific hazards of the project site. Project duration was ...

  • Remediation and Construction Services Brochure

    Partnering with you for successRemediation and Construction ServicesEnvironmental Quality Management, Inc.Remediation and ConstructionEQ’s Remediation and Construction group has successfully supported government, industrial, and commercial clients for more than 20 years. Our staff is comprised of engineers, geologists, hydrogeologists, chemists, environmental scientists, hazardous waste managers, ...

  • FSI Contractor Services Brochure

    FSI Contractor Services VOC Vapor Control Industrial Degassing Centrifuge Vapor Abatement Vacuum Truck Vapor Control Industrial Waste Vapor Processing Tank Bottom Removal System Complies with stringent air quality requirements Permitted by TCEQ, SCAQMD, NJDEP, SJVAPCD and many others. VAPORS CAN BE CONDENSED BACK INTO LIQUID FOR RECYCLING Services Include ? Tank degassing ...

  • Adrian, MI - PCE Remediation at Active Facility Brochure

    ADR09 ShortV ProjEx 011111 acf.docx © 2010, TRS Group, Inc. All rights reserved. PCE Remediation at Active Manufacturing Facility Confidential Client - Adrian, MI Project Summary TRS Group, Inc. (TRS) provided a Standard Fixed Price Remediation (SFPR) source removal of perchloroethene (PCE) and PCE daughter products in soil and groundwater using Electrical Resistance Heating (ERH) ...

  • Internal Joint Sealing System HydraTite

    513.827.9169 | www.hydratechllc.comENGINEERED PRODUCTSydraTechHydraTite®According to an AWWA report1, 30% of your potable water may be actively leaking into the groundHydraTite® is an internal sealing system that offers customized mechanical remediation for pipe joint repairs without excavation. Featuring rapid installation and return-to-service, HydraTite® has been proven ideal for emergency ...

  • Fort Lewis Superfund Site, Washington Brochure

    TRS Project Manager and QA/QC team: Mr. Joe Sturza; Mr. Tom Powell and Mr. Michael DodsonTRS Project Engineer: Mr. Greg Beyke, P.E.Site Geology and Hydrology: Glacial deposits of sand, gravel, clay, silt; groundwater depth averaging 5-ft bgsTreatment Area Size, Volume, and Depth: 3 areas combined = 66,000 ft2; 90,000 yd3; 2 to 35-ft bgsMass Removed - Area 1: 95,029 lbs – 93% TPH, 6% TCE, 1% ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you