Waste Incineration Articles

  • Leading from the front

    As one of the world’s leading incinerator design companies we have to stay ahead of the game. There is an old saying in business and it goes: “If you stand still you get left behind” and that has never been more true than it is today. As a leading incinerator design company we are always looking ahead … at new design innovations, at the latest ...


    By Todaysure Limited

  • Case study - SP Fire Laboratory, Sweden

    Fire laboratory at SP Borås uses EnviBat’s Wet Electrostatic Precipitator technology (WESP) since 2007. Extremely low emissions and high availability are key advantages. Project: WetESP for Fire Laboratory Many fire tests are made in full scale. Example for fire tests can be engine rooms, vehicles, store houses, compartments etc. Most of the tests will include ...


    By Envibat AB

  • Case study - SP, Technical Research Institute of Sweden

    Customer: SP, Technical Research Institute of Sweden Project: WetESP for Fire Laboratory Many fire tests are made in full scale. Example for fire tests can be engine rooms, vehicles, store houses, compartments etc. Most of the tests will include ignite phase, full fire and extinguishing. The ignite phase is sooting, full fire will give high temperatures ...


    By Envibat AB

  • Case study - LKAB, Sweden

    Customer: LKAB, Sweden Project: WetESP pressurized - Processgases Blast Furnace Year 1997 LKAB installed a pilot Blast Furnace at Swerea- MEFOS, Luleå. The product gas contains both CO and H2. The Blast Furnace operates at 0,8 bar over pressure. The design pressure for the WESP is 1,5 bar. The emission standards for dust are < 10 mg/Nm3. This gave ...


    By Envibat AB

  • Brand Leaders - Why Matthews’ brand names mean we are the world’s most trusted incinerators UK company.

    Major capital purchases, whatever they are, are usually decided on a number of tried and trusted factors.  Cost obviously comes in the equation.  Availability is another consideration.  But perhaps even more critical to the buying decision is a customer’s confidence in the company and that means not only knowing, but also trusting in its product brand names.  In a global ...


    By Todaysure Limited

  • Case study - Perstorp Speciality Chemicals AB,Perstorp, Sweden

    Customer: Perstorp Speciality Chemicals AB,Perstorp, Sweden Project: Chemical Waste Incinerator operating WESP Perstorp AB started up their Chemical Waste Incinerator year 2007. The emission standard to meet stated < 5 mg/Nm3. With a standard as low as 5 mg the natural choice ended up in a WESP. Result The plant has operated ...


    By Envibat AB

  • QinetiQ – Modular EU Compliant incineration package - Case Study

    TodaySure™ were commissioned to construct an Integrated Battlefield Support System Incinerator as part of a Ministry of Defence funded research programme, to demonstrate that waste management can be achieved in a responsible way, compliant with challenging environmental standards. Designed to meet the stringent requirements of the EU Waste Incineration Directive, the combustion chambers, ...


    By Todaysure Limited

  • UK Abattoir – Rotary incinerator - Case Study

    Designed to process animal remains 24 hours/day, 7 days/week, with the minimum of operator attendance. To optimise the plant’s performance and to enable waste to be processed and stored, irrespective of the status of the combustion plant, the waste is crushed into 50mm cubes. The material is then conveyed into a buffer hopper, which stores sufficient material to enable the plant to be left ...


    By Todaysure Limited

  • British antarctic survey team – Containerised waste disposal incinerators - Case Study

    TodaySure™ was selected to supply two containerised incinerators for the South Pole, which is the most pristine wilderness on Earth. Working in extreme temperatures and climate conditions, the units are designed to dispose of food scraps and sludge from the biological treatment ...


    By Todaysure Limited

  • Vanuatu government – Containerised general waste incinerator - Case Study

    TodaySure™ has recently constructed the installation of a containerised incinerator for the island of Vanuatu in the South Pacific Ocean. Permanently mounted into a modified 20′ ISO shipping container, which incorporated internal lighting, electrical sockets etc. The incinerator was fully tested and fired in our works and with the exception of the chimney, which is stowed in the ...


    By Todaysure Limited

  • How to make your waste disposal process pay for itself

    Incineration waste to energy means you can get FREE HEAT! It’s true to say that the first priority of any of the industrial waste incinerators we design and manufacture is to provide an efficient, cost-effective, environmentally responsible and legally compliant waste disposal system. ...


    By Todaysure Limited

  • Incinerator Plant, Lidköping - Case Study

    SWEDEN: Baling of MSW In Lidköping the incineration plant is connected to the central heating systems of the city. However, incineration plants has a high demand for fuel in the winter season and limited demand in the summertime. Inflow of material, however, comes evenly all year around and this gives a need to store waste during the summer. The solution to this is the ...


    By Flexus Balasystem AB

  • NIMES - Case Study

    France: Baling of MSW The incineration plant of Nimes, France has a capacity of 110,000 tonnes/year in one line. The choice of a single line of 14 tonnes/hour instead of two lines (2 x 7 tonnes/hour), significantly reduces the amount of investment, this was made possible by the installation of the Flexus baling system that ensures the ability to receive waste even when the ...


    By Flexus Balasystem AB

  • Zinc removal from aqueous solution using novel adsorbent MISCBA

    Pollution caused by heavy metals has become a serious problem to the environment nowadays. The treatment of wastewater containing heavy metals continues to receive attention because of their toxicity and negative impact on the environment. Recently, various types of adsorbents have been prepared for the uptake of heavy metals from wastewater through the batch adsorption technique. This study ...


    By IWA Publishing

  • ARCO Chemical - Case Study

    Custom Designed Furnace Reclaims $100,000 Condenser PCPC burn-off oven removed 4,240 lbs. of styrene polymer in compliance with local environmental laws. The Problem: ARCO Chemical Company's Beaver Valley plant in Monaca, PA, a manufacturer of styrene-based plastics, was experiencing severe problems and expense with the periodic cleaning of their ...

  • Are incineration and landfills the answer to save us from the recycling crisis?

    For plastic recycling, this year hasn’t exactly been one of the best – what is to blame? Oil. Shockingly, it actually costs more to recycle old plastic than it does to make new in many ways. Petroleum prices have fallen so low, as low as 70% below the level in June 2014. This may be great for some – however with it has fallen the cost of Virgin Plastic which is made from ...


    By GPT Waste Management Ltd

  • What does Brexit mean for demand of UK Refuse Derived Fuel (RDF)?

    Demand for UK refuse derived fuel (RDF) exports to fill up incinerator capacity in Europe is likely to continue even if Britain leaves the European Union in June, waste experts have suggested. The market for the export of UK waste to the mainland, especially the Netherlands, is to be viewed as one which has a high degree of certainty going forward: Brexit or no Brexit. The export of UK ...


    By GPT Waste Management Ltd

  • District heating (dh) pipeline owned by dutch utility poses unique inspection challenge

    Would you take on a new pipeline inspection challenge, even if you knew it would land you in hot water? Recently Pure Technologies (Pure) was able to chalk up success by adding one more type of pipeline to its inspection resumé. In this instance it was a district heating pipeline owned and operated by Eneco, one ...


    By Pure Technologies

  • World famous watch manufacturer chooses Bramidan as time matters - Case Study

    Swiss leader watch designer and manufacturer TISSOT has taken advantage of the new expansion of its premises to invest in a fully automatic Bramidan channel baler to optimize waste handling procedures. For many years, Tissot had been using a 20m3 waste compactor to handle all types of waste fragments. Once full, the compactor used to be sent to an incinerator located 10 km away from the factory. ...


    By Bramidan Balers

  • WESPS continue to deliver

    Compliance with the increasingly stringent air pollution regulations of recent years is not the only reason forwardthinking industry leaders are adopting more sophisticated gas cleaning and air pollution control strategies. The desire to achieve higher performance efficiencies, control costs in a competitive marketplace, and stay ahead of the regulatory compliance curve is another driver of ...


    By Beltran Technologies, Inc.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you