fixed-price remediation Articles
-
Guaranteed fixed price remediation of PCE and TCE in soil confidential client, Chicago, IL
TRS Group, Inc. (TRS) as a subcontractor to Levine Fricke provided a guaranteed fixed price remediation of tetrachloroethene (PCE) and trichloroethene (TCE) in soil using Electrical Resistance Heating (ERH) at a confidential site located in Chicago, Illinois. Unique aspects of this project included using a sheet pile wall as one continuous electrode (120 feet long) and using individual sheet pile ...
-
Southern New Jersey - Guaranteed benzene remediation in soil and groundwater - Case Study
Project Summary TRS Group, Inc. (TRS) under contract with URS Corporation ( URS) and Resource Environmental, LLC (RELLC) conducted an electrical resistance heating (ERH) remediation of benzene at a former gasoline service station located in southern New Jersey, The project scope of work was contracted as a Guaranteed Fixed Price Remediation (GFPR) that included no rebound of benzene in ...
-
Indianapolis, Indiana - CVOC remediation adjacent to occupied building with sheet pile electrodes - Case Study
Standard Fixed Price Remediation of TCE and VC in soil and groundwater Project Summary TRS Group, Inc. (TRS) provided a Standard Fixed Price Remediation (SFPR) of trichioroethene (TCE) and vinyl chloride (VC) in soil and groundwater using Electrical Resistance Heating (ERH) for AECOM at a confidential site located in Indianapolis, Indiana, Unique aspects of this project included the ...
-
Environmental Liability Management for a Large American University
Challenge A large American university recently acquired a two-hundred acre hospital property for the purpose of future developments. One fifth of the property was impacted by chlorinated solvents and petroleum. Antea Group was appointed to assume the liability, return the land to residential use, and abate the migration of contaminants with minimal disruption to the campus or the hospital. ...
-
Chlorinated VOC Groundwater & Soil Remediation - Case Study
Summary Burns & McDonnell was retained to perform soil and groundwater remediation of chlorinated volatile organic compounds (VOCs) such as perchloroethylene and trichloroethylene (PCE and TCE) at a warehouse facility in Dallas. A historical spill of the chlorinated VOCs behind the warehouse building resulted in the contamination of soil in the immediate area and shallow groundwater leading ...
-
Remediation of TCE NAPL in active Alleyway Arlington, Texas - Case Study
Goals to achieve separate analyte-specific clean-up goals in clay soils and groundwater respectively Project Summary TRS Group, Inc. (TRS) completed a Guaranteed Fixed Price Remediation (GFPR) of tetrachioroethene (PCE), trichioroethene (TCE), cis-l,2-dichloroethene (cis 1,2-DCE), 1,1,1-trichloroethane (1,1,1-TCA), 1,1-dichloroethene (1,1-DCE), 1,1-dichloroethane (1,1-DCA), methylene chloride, ...
-
Newark, CA - Guaranteed PCE and TCE remediation - Case Study
Guaranteed PCE and TCE Remediation at Hazardous Waste Facility Project Summary TRS Group, Inc. (TRS) completed a Guaranteed Fixed Price Remediation (GFPR) of tetrachloroethene (PCE), trichioroethene (TCE), cis-l,2-dichloroethene (cis 1,2-DCE), 1,1,1-trichloroethane (1,1,1-TCA), 1,1-dichloroethene (1,1-DCE), 1,1-dichloroethane (1,1-DCA), methylene chloride, and Freon 113 in soil and groundwater ...
-
Remediation of TCE NAPL in active Alleyway Arlington, Texas - Case Study
Project Summary TRS Group, Inc. (TRS) completed a standard Fixed Price Remediation (SFPR) of trichioroethene (TCE) in soil in Arlington, TX using electrical resistance heating (ERH) in 2012, The system incorporated 19 electrodes with horizontal vapor recovery (VR) wells to treat a soil volume of approximately 4,155 cubic yards (yd3) located between two active buildings. Active subsurface heating ...
-
TCE Source Area Remediation at a Former Manufacturing Facility Confidential Client – Western Connecticut - Case Study
Project Summary TRS Group, Inc. (TRS), as a subcontractor to AECOM, completed a Standard Fixed Price Remediation (SFPR) of trichloroethene (TCE) in groundwater in Western Connecticut using Electrical Resistance Heating (ERH). The objective of the ERH project was to achieve the prescribed remediation goal for dissolved TCE in groundwater within the treatment volume. The system incorporated 89 ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you