well monitoring system Articles
1 articles found
-
Case study - Rapid removal of chloroethenes at industrial sites
Description Air sparging with trenches had failed to remove groundwater and soil contamination at an industrial Superfund site in Piedmont soils in South Carolina. The major contaminants of concern were cis 1,2-dichloroethene (DCE) and trichloroethene (TCE) ranging from 0.5 to 2.0 mg/L. The treatment area was approximately 15,000 square feet. Ozone sparging was chosen as preferred ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you