acoustic current meter Articles
-
OTT ADC measurement - Germany
Background As the open pit Cottbus Nord is making use of the water of the ponds in the protected landscape of Lakoma (a village 6 km from Cottbus) the Vattenfall Europe Mining AG (VEM) as owner of the pit was obligated to take compensation measurements. VEM entrusted the engineers of the gerstgraser Ingenieurbüro für Renaturierung (gIR) in Cottbus with the planning of the structuring ...
-
Turbine flow measurement in intakes: a cost-effective alternative to measurement in penstocks - Case Study
Hydro utilities require flow meosurement for the settlement of turbine contracts and to support optimal operation. The high costs and inconvenience associated with traditional methods (instruments installed in penstocks) are leading some utilities to search for cost-effective alternatives. BC Hydro's investigations into flow measurement in intakes are discussed. Typical practice for turbine flow ...