Birmingham Water Works Board Leak Detection Program case study
Service: SoundPrint AFO Client: Baltimore City Project Date: 2012 Location: Baltimore, MD Type of Pipeline: Water Transmission Main Diameter: 54-inch (1350mm) Pipe Material: PCCP Baltimore City features 130 miles of Prestressed Concrete Cylinder Pipe (PCCP), 15 percent of which is Class IV PCCP installed in the 1970s. This particular class of pipe has been prone to early failures ...
-
Case study - Baltimore City public works intervenes on pipe section about to fail
Service: SoundPrint AFO Client: Baltimore City Project Date: 2012 Location: Baltimore, MD Type of Pipeline: Water Transmission Main Diameter: 54-inch (1350mm) Pipe Material: PCCP Baltimore City features 130 miles of Prestressed Concrete Cylinder Pipe (PCCP), 15 percent of which is Class IV PCCP installed in the 1970s. This particular class of pipe has been prone to early failures across the ...