basin aerator Articles
-
Fixed vs. Moving Bed Systems: Basin Geometry
Aeration basins can have length to width (L:W) ratios varying from 1:1 (square) to over 30:1 (plug flow). The L:W ratio of an aeration basin directly impacts both the physical installation and biological performance of a submerged fixed-film system. Physical Installation Moving bed biomass carriers are free to move about the aeration basin. The aeration system provides energy to keep the ...
-
Columbus, Texas - Case Study
The Columbus WWTP was receiving an overload of grease from restaurants. Some of the grease was traveling only 150 yards before discharging directly into the WWTP. Because of the grease received at the plant, there was little settling occurring in the 30-minute settling tanks, despite personnel maintaining a low mixed liquor in the aeration basin. The plant was hauling off up to seven loads of ...
By BioCOPE Inc.
-
Update Info AQUA DESIGNER 9.2
AQUA DESIGNER is the practice oriented design program for activated sludge plants in Germany and worldwide. The range of tools has been extended over the last few years to all important procedures and procedural stages.- Sand trap as ventilated sand and fat catcher or round sand trap.- Primary clarifier as rectangular or round basin.- Aeration as continuous flow or SBR with common container ...
-
Fixed vs. Moving Bed Systems: Media Retention and Headloss
Submerged fixed-film media is utilized within aeration basins to optimize biological treatment and increase capacity. Therefore, proper design and installation of the equipment used to keep the media in the aeration basin and prevent it from passing downstream is critical to system function. Physical Restraint of Submerged Media Moving bed systems typically use submerged stainless steel ...
-
Coldwater, Michigan - AccuFAS - Biological Treatment installations applications - Case Study
Application The wastewater treatment facility in Coldwater received tighter seasonal ammonia limits of 2 mg/L from May to November. Compounding this challenge, groundwater levels around the plant limited facility expansion and upstream industries caused organic shock. AccuFAS was selected as a retrofit solution for the existing solids contact aeration basins. The plant continues to consistently ...
-
Usak Karma OSB - Case Study
Project name Usak Mixed Organized Industrial Zone Wastewater Treatment Plant Employer Usak Mixed Organized Industrial Zone Head of Entrepreneur Association Contractor Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Usak/TURKEY Scope of work Industrial and Domestic Wastewater Treatment Plant Contract Date 2005 Completion Date 2006 Flowrate of the plant:24.000 mJ/ ...
-
Simple Aeration Header Cleaning System Allows A Food Processing Facility Get Back On Track
On the afternoon of May 19, 2011, KLa Systems was contracted by one of their customers located in Virginia. They stated that their aeration basin was running at nearly 0 mg/l dissolved oxygen (DO) residual with both blowers running at 100% capacity. Based on the conversation it was determined that a KLa field service technician was needed on site immediately. The following morning KLa personnel ...
-
Improving total nitrogen removal in aeration basin retrofitted with entrapped biomass
This study presented a method to upgrade existing aeration tanks to remove total nitrogen (TN). Bioplates carrying entrapped biomass were installed in an aeration basin to create anoxic/anaerobic zones where denitrification can proceed. In a reactor that coupled bioplates containing entrapped biomass (equivalent to as high as 7,500 mg/L of biomass) and an activated sludge suspension (at mixed ...
-
My diffuser goes up to eleven, actually twelve
Abstract Fine pore membrane diffusers arc used extensively worldwide for aeration of activated sludge basins. Aeration can account for as much as 60% of a plant's energy usage (Rosso, et al. 2005). Pore fouling and membrane material degradation can reduce energy efficiency of fine pore membrane diffusers to 50% of the original efficiency after just a few years of operation. Tins work ...
-
A pilot study on suspended activated sludge process augmented with immobilized biomass for simultaneous nitrification and denitrification
Concurrent nitrification and denitrification (CND) are natural phenomena in the soil environment that can be applied in wastewater treatment for enhanced total nitrogen removal. However, significant renovation is necessary for existing plants to equip them for nutrient removal. At a domestic wastewater treatment plant, we performed a pilot test by installing bioplates with entrapped biomass in ...
-
Waterschap Brabantse Delta (NL) - Case Study
For two sewage treatment plants of Dutch water board “Brabantse Delta”, Landustrie supplies 3 no. brush aerators, also called aeration rotors. Unique here is the design of the aeration units. Normally the brush aerators are fixed mounted between the side walls of an aeration ...
-
Activated sludge wastewater treatment plants optimisation to face pollution overloads during grape harvest periods
ABSTRACTThe principal objective of our study was to optimise a municipal activated sludge wastewater treatment plant (WWTP) to face high organic flows due to viticulture effluents inputs. Treatment file optimization consisted in testing different treatment lines, changing the number and volume of biological basins and clarifiers, with or without a buffer basin upstream, with a view to achieving a ...
-
Ozakteks Textile - Case Study
Project Name Ozakteks Tekstil A.§. Wastewater Treatment Plant Employer Ozakteks Tekstil A.§. Contractor Enta Muhendislik Aritma Taah. San. Ve Tic. Ltd. Sti. Location of the plant ISTANBUL/TURKEY Scope of work Industrial and Domestic Wastewater Treatment Contract Date 2006 Completion Date 2006 Flowrate of the plant: 2.000 m3/day Inlet Pollution Parameters: COD: 1200-1400 mg/L ...
-
COVID19 Surge of Wipes at WWTP`s - OR-TEC has the Solution
Wastewater Treatment Plants have been struggling with wipes for a few years now but, facilities are seeing an increased number of disinfectant wipes, latex gloves and face masks being flushed down toilets, creating clogs, blockages, and other damage to critical infrastructure. These wipes do not disintegrate. De-ragging pumps, aerators, aeration basins and unclogging pipes is labor intensive and ...
-
UPM, Jämsänkoski mill
Wastewater Treatment Plant General Information Water flow, Q 30 000-35 000 m3/d COD load 50 -70 t/d Incoming water to Equalization basin is 40-42°C, occasionally 47-48°C Maximum volume of Equalization basin 15 000 m3 Level of water varies between 3-5 m Equalization basin before Installation of AIRIT® Aerator Equalization ...
By W-Rix Ltd
-
Sivas Municipality – Case Study
Project Name Sivas Wastewater Treatment Plant Employer Sistem Yapi Jnsaat Tic. A.§. Contractor Enta Muhendislik Aritma Taah. San. Ve Tic. Ltd. §ti. Location of the plant Sivas/TURKEY Scope of work Domestic Wastewater Treatment Plant Supply of Equipment and installation Contract Date 2008 Completion Date 2008 Flowrate of the plant: 78.500 m3/day Units of the Plant: Physical ...
-
Wilsonville WWTP Biosolids - Case Study
About the Project The new facility includes two new structures: a dewatering and drying building, and a head works building. There are five additional major structures, including a new aeration basin, stabilization basin, clarifier, a bio-tower and ultraviolet light channel structure. All of these are used in the various stages of treating raw sewage before it is discharged as clean water into ...
-
Increased plant efficiency, City of Checotah, Oklahoma
The City of Checotah, Oklahoma was experiencing excessive solids, foam and grease in their 0.5 MGD extended aeration activated sludge treatment facility. With a daily average flow of 0.25 million gallons per day, the plant had tremendous amounts of foam and grease in the aeration basin with the sidewalls caked with sludge. The centerwells of the clarifier were filled with foam and grease. The ...
-
Ceramic Tube Diffuser EKR - Dirnau (Landshut) Purification Plant - Case Study
In 2019, ENVICON has won the tender for a retrofit of the ceramic tube diffusers in the Dirnau (Landshut) purification plant. As well as providing the diffusers, ENVICON also carried out the project coordination, removal, installation and commissioning as well as the disposal of the old diffusers. The existing plastic-bonded ceramic tubes were replaced. Due to the design of our diffusers, some ...
By ENVICON GmbH
-
Understanding F:M Ratio
F:M ratio as a theory is one of the most important aspects in wastewater treatment but also one of the most poorly understood concepts. Occasionally textbook numbers are good guides, however there are many instances in which understanding the complexity of F:M ratio may help to provide further insight. As a consultant it is very common to see strong emphasis on calculations such as F:M ratio. ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you