waste processing installation Articles
-
Integrated system for regulatory control of the radioactive waste management in radioactive installations
The object of this paper is to present the 'Integrated Information System for Supporting the Inventory Control of Radioactive Waste' ? SICORR. The SICORR model considers the following items: the radioactive waste control inventory, encompassing the treatment and integration of the radioactive waste and the radionuclide data and processes; the installations that produce, use, transport or store ...
-
Paper mill recycling - Case study
User: Paper Mill recycling OCC (Old Corrugated Containers) Materials: OCC recycling process wet waste rejects Before Installation Of ExtruderMONTHLY WASTE VOLUME: 78 loads, 30 cubic yards each MONTHLY EXPENSE – HAULING & TRANSPORTATION: $142,826.00 After Installation Of Extruder MONTHLY WASTE VOLUME: 22 loads, 30 cubic yards each MONTHLY EXPENSE – HAULING & ...
-
Gatineau Sewage Treatment Plant, Gatineau, Quebec, Canada
Project No. 1 Industrial Boiler Application A FLU-ACE waste heat recovery system installed to process all flue gases from three boilers. The system recovers up to 3.5 mmBTU/h of waste heat which is re-used for heating the digester sludge. The main fuel for the boilers is recycled methane based sewage gas generated from the plant’s anaerobic digesters. 'The installation continues to result ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you