Well Water Monitoring Training For Monitoring And Testing Available In New Jersey
-
based in USA
The well is installed, the surface completion is finished but the well is still not ready to sample. Development is a critical step following construction of monitoring wells that is often short-changed or, sometimes, not implemented at all when new wells are installed at a site. This can result in a detrimental impact on the ability of the new well to yield representative ground-water samples ...
-
based in USA
There are a lot more useful and appropriate purging and sampling device options available than the bailer! Learn what types of sampling devices are appropriate for a variety of analytical parameters, and which devices should never be used for some parameters. This series of 2 modules provides a detailed discussion of a wide range of devices available for purging and sampling ground-water ...
-
based in USA
It is a common practice to use a variety of field equipment that travels from well to well during a ground-water sampling event. Portable equipment such as water-level gauges, flow cells, analytical instruments and multi-parameter sondes are examples of some equipment that is used in each monitoring well, even in situations where dedicated pumps are used. And, of course, where portable pumps are ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you