Several mid sized items are included in this sprint.

The most important items are:

  • Complete remaining issues with the new EEMS framework
  • The Add calculation methodology pop-up will go through a large modification. The modification will include an easier to use interface and an useful overview over the current status.
  • Cleanup/Mapping in the Data Quality Pack.
  • New server work (mostly PI Server Configuration)
  • Extention of the Paste Feature. This time for water analysis.
  • We are working on a modified framework for the grid pages. Expect faster load time and far more additional information even easier available. The framework will gradually be phased in.
  • We will, as always, have a high focus on bugs that surfaces during the sprint.