biogas drying News

  • EnviTec Biogas takes over further biogas plant in Mecklenburg-West Pomerania

    This autumn the own operations division of EnviTec Biogas AG has grown: After acquiring three times 526 kilowatts (kW) in Sukow, Mecklenburg-West Pomerania in September, an additional 500 kW from the biogas plant in Passin are now boosting the company-owned operations of the biogas all-rounder from Lower Saxony. The farmers Siegfried and Rainer Bretting each have a 25 % share and EnviTec a 50 % ...


    By EnviTec Biogas AG

  • ElectraTherm Green Machine Installed at Biogas Plant in Austria

    ElectraTherm installed its first Green Machine in Austria at a biogas power generation facility to increase electrical production at the site without adding fuel or emissions. The site produces biogas through anaerobic digestion to fire a 500kWe GE Jenbacher 312, generating electricity to sell to the grid while using heat to dry crops during harvest. With the addition of the Green Machine, excess ...


    By ElectraTherm

  • American Biogas Council 2015 Award Winners

    The American Biogas Council (ABC) presented its annual awards during an evening reception at BioCycle’s 15th Annual Conference on Renewable Energy From Organics Recycling (BioCycle REFOR15) in Danvers, Massachusetts in October. BioCycle REFOR15 is the Official Conference of ABC. “The Biogas Industry Awards not only recognize excellent projects and innovations,” explained ...


    By BioCycle Magazine

  • Biower’s succesful biogas reactor deliveries to Central-Europe

    Biower’s deliveries are bioreactors which are key process parts in a biogas plants producing biogas from bio-degradable waste. Deliveries have been done cooperation with Biower’s technology partner Swiss Kompogas AG, which is developer of word-leading dry fermentation method. Dry fermentation is most effective method to produce biogas, electricity, heat and fuel to vehicles from ...


  • WELTEC Group Acquires 3.3 MW Biogas Plant

    In 2015, the WELTEC Group had acquired two biomethane refineries. Now the company has taken the next step on its growth path: In January 2016, Nordmethan GmbH, a subsidiary of the plant manufacturer WELTEC BIOPOWER, purchased an existing biogas plant in Falkenhagen, Brandenburg, Germany. Following the fundamental technical and administrative restructuring and modernisation, the ...


    By WELtec BioPower GmbH

  • Biogas Cogeneration Plant for the University of Wisconsin Oshkosh to produce Electricity & Heat

    2G - CENERGY received an order for a biogas CHP cogeneration plant to be installed in Oshkosh, Wisconsin, supplying the University Campus with electricity and thermal energy. Earlier this year the University of Wisconsin Oshkosh (UWO) decided to build the first dry fermentation anaerobic bio-digester in the nation, which will convert yard and food waste into biogas. The renewable energy facility ...


    By 2G Energy AG

  • ETW Energietechnik developed the SmartCycle PSA to upgrade biogas to RNG

    The Pressure Swing Adsorption (PSA) technology is recognized for decades as an effective and feasible process for gas upgrading in different large scale industrial applications. The German company ETW Energietechnik GmbH located in the city of Moers successfully improved and optimized this technology for the biogas upgrading process. The new Biogas upgrading technology was developed by a team of ...


    By ETW Energietechnik GmbH

  • BiogenGreenfinch and Geotech work together to develop portable and fixed biogas monitoring

    Geotech's partnership with AD technology suppliers BiogenGreenfinch started in 2008 with the loan of two newly introduced biogas analysers - a portable Biogas Check and a static Geotech Automated Extraction Monitoring System (AEMS). BiogenGreenfinch were the first in the UK to try, test and report on these then-new introductions. “It gave us the benefit of seeing and using new equipment ...


    By Geotech

  • Biogas all-rounder EnviTec concludes another two contracts in Denmark

    Following the successful start of construction work on the first EnviThan gas upgrading plant in Denmark, EnviTec Biogas AG announced two further construction projects. With the signing of contracts for two biomethane plants rated at 396 Nm³, the biogas all-rounder from Lower Saxony is actively pursuing the growth strategy that it launched in Denmark last year. Sited in Otterup, in the north ...


    By EnviTec Biogas AG

  • ENER-G expands CHP wastewater treatment and biogas team

    ENER-G Combined Power has expanded its specialist CHP wastewater treatment  and biogas team with the appointment of biofuels experts Martin Wager and Laurence Stephenson. Martin joins ENER-G as Business Development Manager (Biofuels) from Cogenco. He has been involved in more than 40 CHP sewage treatment and ...


    By ENER-G

  • U.S. EPA launches first waste to biogas mapping tool

    The U.S. Environmental Protection Agency’s Pacific Southwest Region has launched an online “waste to biogas mapping tool” to support the use of organic waste for energy projects. “This innovative mapping tool, the first of its kind in the nation, helps restaurants, hotels and other food waste generators to connect with large energy producers,” said Jared Blumenfeld, ...

  • Bologna (ITA): The Construction of Europe’s Largest Dry Anaerobic Digestion Plant Can Begin

    Europe’s largest dry anaerobic digestion plant is to be built in Bologna, Italy. The Notice to Proceed was given on Friday, March 31, 2017, so giving the green light for construction to begin. Hitachi Zosen Inova can thus now start delivery of the core modules. Europe’s largest dry anaerobic digestion plant is to be built in Bologna, with an annual throughput of 100,000 tonnes of ...


    By Hitachi Zosen Inova AG

  • Greenlane Biogas Secures US$2.3 M Contract from Longneng Weiye Environment and Technology Holdings

    Greenlane Biogas has received a US$2.3 M contract from Longneng Weiye Environment and Technology Holdings, a Chinese company specializing in the recycling of agricultural and municipal solid waste into renewable energy, for the purchase of two ‘Rimu’ biogas upgrading systems. The units will be installed in Tonghe and Shangzhi counties in Heilongjiang province, where dry and wet ...

  • EnviTec HighGester lowers input costs by 10%

    Just nine months in real-world operation and already exceeding expectations: the HighGester from biogas all-rounder EnviTec Biogas (Lower Saxony, Germany) is not only impressing the operators of the biogas plant in Bakum in the district of Vechta, where the vertical “plugflow” digester is currently saving them over 10% of their input costs. Compared to a conventional, fully mixed ...


    By EnviTec Biogas AG

  • Consortium WTE/CAMBI has been awarded a contract in Vilnius/Lithuania

    On 29 September 2008 the German water experts WTE Wassertechnik GmbH together with its Norwegian partner Cambi AS signed a major order for the construction of the sludge treatment plant in the Lithuanian capital Vilnius. The employer is Vilniaus Vandenys, the municipal Water- and Wastewater Company of Vilnius. The Consortium will construct one of Europe’s most advanced sludge treatment plants for ...


    By Cambi Group AS

  • Contract for the construction of a new sludge treatment plant signed by Cambi/WTE

    On 29 September 2008 the German water experts WTE Wassertechnik GmbH together with its Norwegian partner Cambi AS signed a major order for the construction of the sludge treatment plant in the Lithuanian capital Vilnius. The employer is Vilniaus Vandenys, the municipal Water- and Wastewater Company of Vilnius. The Consortium will construct one of Europe’s most advanced sludge treatment plants for ...


    By Cambi Group AS

  • EnviTec completes construction of sixth plant in France after just nine months of construction

    “It’s a flagship project for the entire region,” enthuses Jean-Luc Da Lozzo, operator of the 637 kW EnviTec biogas plant in the French region of Belesta en Lauragais (Haute-Garonne), which is now operational. The plant, completed by North German plant engineers EnviTec Biogas in just nine months, heralds the start of a very special sustainability project by the customer. Da ...


    By EnviTec Biogas AG

  • Measuring methane

    At the UK's first viable compact anaerobic digester (AD) plant aimed at local food waste treatment, a Geotech GA3000 fixed biogas analyser monitors methane (CH4), carbon dioxide (CO2), oxygen (O2) and hydrogen sulphide (H2S). The plant, a modular scalable AD system, unveiled by React Environmental in July 2012 at Llangadog, Carmarthenshire, can handle some 1,000 ...


    By Geotech

  • Cambi awarded contract in Växjö

    Cambi AS has been awarded the thermal hydrolysis contract for upgrading the biogas plant at Sundet wastewater treatment plant in Växjö, Sweden. Växjö is located in southern Sweden and is regarded as one of the “greenest” cities in Europe. The city has more than 61 000 inhabitants. This is Cambi’s first contract in Sweden and a breakthrough in the Swedish ...


    By Cambi Group AS

  • Cambi awarded contract in Stavanger

    Cambi is awarded the contract of the core technology in a new biogas plant in the municipality of Hå, outside Stavanger on the south-west coast of Norway. The plant is planned as a multi fuel plant, initially fed by waste water treatment sludge, but later also household waste and liquid waste. It will treat sludge and waste from several municipalities in the area around Stavanger, with an ...


    By Cambi Group AS

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you