biogas system design News

  • One of world`s largest agro-industrial biogas plants under construction

    In February 2016, Coltrade B.V. and its partner Ahidra S.L., signed an EPC contract for one of the largest organic waste to energy recovery facilities in the world within the dairy industry. After months of design and engineering of the highest level, where efficiency became an obsession, the plant is now under construction. The installation is located in northern Spain (Asturias) and will ...


    By Colsen International b.v.

  • Renewable Biogas

    Reportlinker.com announces that a new market research report is available in its catalogue: Renewable Biogas ...


    By ReportLinker

  • Renewable Biogas

    Reportlinker.com announces that a new market research report is available in its catalogue: Renewable Biogas ...


    By ReportLinker

  • Biogas monitoring yields rewards

    Whilst there is increasing interest in generating power from waste gas, this has been central to one company for years. Based in the UK, Geotech has been helping water utilities, agricultural and landfill operators and food waste processors worldwide offset energy costs or generate income from waste-generated biogas, manufacturing portable and fixed monitoring equipment. Geotech has over 200 ...


    By Geotech

  • The Potential for Biogas in Africa

    When thinking about renewable energy it’s common to think of wind power and solar. However there is massive potential in Africa for the utilisation of renewable gas for power generation. Some naturally occurring microbes are able to break down organic material in the absence of oxygen to produce different types of biologically created gas – ‘ ...


    By Clarke Energy

  • ENER-G partners with Cornes Biogas to enter Japanese Biogas CHP market

    Combined heat and power (CHP) specialist ENER-G has appointed Cornes Biogas  as its Cogen Partner for Japan - gaining a first contract at Shikaoi municipal biogas plant, in Hokkaido. A 190kW ...


    By ENER-G

  • ENER-G showcases biogas CHP innovation at UK AD & Biogas 2015

    ENER-G will showcase its high efficiency biogas CHP innovations at UK AD & Biogas 2015 (1-2 July) at NEC, Birmingham. ...


    By ENER-G

  • Construction of new biogas plant with the EnviThan gas upgrading system to start in June

    The Chinese energy market is booming - and this also applies to renewable energies from biomass. EnviTec, the biogas all-rounder from Lower Saxony, is profiting from its international expertise, concluding a second contract in the Middle Kingdom. After the successful go-ahead for the construction of an EnviFarm Classic biogas plant with the EnviThan gas upgrading system in Jiyuan, Henan Province, ...


    By EnviTec Biogas AG

  • Construction start for biogas plant with EnviThan gas upgrading system in China

    The Middle Kingdom invests in “made in Germany” biogas technology: With the contract conclusion between the China Shipbuilding Industry Corporation (CSIC) and EnviTec Biogas AG, the biogas all-rounder based in Lower Saxony is setting foot on Chinese soil. The state-owned company CSIC, which employs about 300,000 people, is investing in an EnviFarm Classic biogas plant with EnviThan ...


    By EnviTec Biogas AG

  • ADI Systems To Design And Build New Wastewater Treatment System For Adm In Brazil

    Archer Daniels Midland Company (ADM) has selected ADI Systems Inc. to design and build a new wastewater treatment system at one of its processing plants in Brazil. ADM, one of the world's leading agricultural processors, produces quality foods, livestock feed ingredients, alternative fuels, as well as other products. ADM connects crops to markets in more than 140 countries on six continents. The ...


    By ADI Systems

  • Building on reliability and accuracy – the new BIOGAS 3000

    Geotech’s new fixed gas analysis system, the BIOGAS 3000, primarily for the Anaerobic Digestion (AD) biogas and bio-methane upgrading market has been designed to enable site operations to maximise gas production yield and protect expensive capital equipment from the damaging contaminant gases contained within the production process. Key to this is building on Geotech’s reputation for ...


    By Geotech

  • Meeting the Ever-Changing Demands of the Global Biogas Market

    Fixed biogas analysers from Geotech are now available with additional options for moisture management to help with challenges from wet biogas.  A new variant on the reliable GA3000 PLUS also provides oxygen (O2) measurement designed for very low O2 levels, and new pre-calibrated cells for ...


    By Geotech

  • Meeting the ever-changing demands of the global biogas market

    Fixed biogas analysers from Geotech are now available with additional options for moisture management to help with challenges from wet biogas. A new variant on the reliable GA3000 PLUS also provides oxygen (O2) measurement designed for very low O2 levels, and new pre-calibrated cells ...


    By Geotech

  • New at LINDNER – Impact Crusher for Biogas Plants

    In recent years numerous researches for the improvement of biogas plants have been made. Most of them were aiming a higher gas yield and a better quality of gas in order to use it in existing gas networks. Also the reduction of the running costs of mixers and pumps as well as the prevention of floating layers have always been topics to be improved. Last but not least the researches focused on ...


    By Lindner-Recyclingtech GmbH

  • Base Structures Ltd latest Biogas Holder installed

    Following the recent commisioning of our 250m3 Biogas Holder at Much Fawley Farm near Hereford, we are pleased to announce our latest installation of our 25m3 Holder at Alderely Edge, Cheshire. Due to the simplicity of our deisgn the installation took just 5 hours from our fully trained and qualified staff arriving on site, to final commissioning and completion. This holder incorporates our ...


    By Base Structures Ltd

  • Easy maintenance of progressing cavity pumps in the biogas production

    In the biogas production processes must inter-relate smoothly and downtimes should be avoided whenever possible – even service breaks should be plannable and short. The positive displacement pump expert NETZSCH Pumps & Systems has therefore developed the "Full Service in Place" (FSIP®) concept for progressing cavity pumps and rotary lobe pumps thereby improving the service ...

  • UTS builds first biogas plant in the Czech Republic

    With the construction of its first biogas plant in the Czech Republic, UTS Biogastechnik GmbH has made successful first steps in its international expansion. Together with its partner Renergy s.r.o., UTS has designed the biogas plant Zavidkovice with a power rating of 620 kW. The construction had already begun in autumn 2007 and will be finalized within the first half-year 2008. The general ...


    By UTS Products GmbH

  • McCain Foods selects Eco-Tec for biogas purification

    Eco-Tec is proud to announce that it has recently been awarded the contract for biogas purification by McCain Foods (GB) Ltd., England. As a socially responsible company and a highly trusted brand, McCain Foods practices sustainable agriculture and is implementing energy efficiency projects at its processing plants around the world to help in the global quest to improve the climate. ...


    By Eco-Tec Inc.

  • New 25m3 Biogas Holder install for Burdens

    Burdens have recently developed their own high tech Anaerobic Digestion plant. On viewing our Biogas Storage sphere at the environmental trade show ETSUK 2011, Burdens recognised immediately the benefits of our simple, modular Biogas Storage unit. This was primarily due to the fact that it matches perfectly the ethos behind the design of their new AD plant, in which every component of the system ...


    By Base Structures Ltd

  • Base Structures develop a DIY installed Biogas Holder

    So simple in fact that we are confident most end users are capable of installing it, potentially saving themselves a significant amount of money. Having a factory process that delivers a sealed product to site is a big help in achieving this. Included with the gas holder delivery is a base template, simply requiring the customer to place this on the prepared concrete foundation to drill ...


    By Base Structures Ltd

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you