save corals from dredging News

  • SediMeters can save corals from dredging

    The ongoing dredging of Miami Harbor has caused siltation (the accumulation of sediments) on the coral reefs outside the harbor. In a settlement of a recent lawsuit, the contractor, U.S. Army Corps of Engineers (USACE), has agreed to pay $400,000 for moving corals out of the way. They are not using any instrument for measuring the sediment accumulation, even though such an instrument exists, is ...


    By Lindorm, Inc.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you