BKP Berolina Polyester GmbH & Co. KG

Successful Installations in Sweden With NCC

0

NCC Infrastructure, with its group HQ in Solna completed two successful pipe rehabilitation job unique set of challenges.

One contract was in the Stockholm municipality of involved the rehabilitation of a storm water pipe. The pipe was totally deteriorated through significant rusting an collapse.

The pipe in lay under a park area and continued under a road carrying heavy volumes of traffic.

Rehabilitation was required for 86 meters of the pipe length, and was successfully carried out using the Berolina Liner DN 1400
a total of 9,500kg's of liner materials being used. The second installation was in the Botkyrka of Stockholm.

The rehabilitation was for a pipe length of 200 meters using and was also in an area with heavy traffic A complicated pumping structure was necessary to prepare for and enable successful relining.

Customer comments

No comments were found for Successful Installations in Sweden With NCC. Be the first to comment!