The amount of water used in and produced by hydraulic fracturing of shale gas wells is in the millions of gallons per well. Whether the water is going to be taken off site for disposal or reused for re-injection, the flowback or produced water needs pretreatment to remove any residual oil from the water. Waiting for remote lab results can take several days to a week. InfraCal TOG/TPH Analyzers allow for oil in water testing at the well site in less than 10 minutes. The sampling requires a few simple steps that can be performed by non-technical personnel. » View more |