Over 6300 Digesters Installed Worldwide
- Advanced F.O.G. & Odor Control
- 100% F.O.G. Removal
- Converts F.O.G. to CO2 & H2O
- F.O.G. will NOT reform
- Destroys H2S Gas
- No Chemicals (Eliminates Chemical use by up to 95%)
- Air Driven (Low Pressure
- Installs in 5 Minuts
- Results in less than 12 Hours
- 1 Hp - 10 Hp (Custom Units Available)
- Eliminates Pump-outs
- Extends Pump Life by up to 80%
- Effluent is up to 65% pretreated in Pump Station
- Won`t Clog
- Oppens clogged lines
- UV Ozone Optional for Advanced Treatment
- NO Moving Parts
- No belts to align, No pulleys to grease, No bearing to replace
- Comes pre-wired and ready for installation (Single or Three Phase)
- Noise level is < 48dB
|