Grouting Equipment With Screening Equipment And Filters For Desalination Plants Applications
1 equipment items found
-
Manufactured by E. Beaudrey & CIE.based in FRANCE
One or more inclined bar racks are installed side-by-side (15° incline) at the plant inlet. On deck, a gantry rail supported by a set of vertical posts, follows the edge of the deck. The carrying trolley runs on the gantry rail. It is fed by a festoon cable system which also runs on the gantry rail. The rake has three cable drums: two to lower and lift the rake, one to open and dose the trash ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you