Vertek a Division of ARA

- Truck Based CPT Push Systems

From

0

Our truck based CPT push systems are robust, rugged and have great maneuverability. Our CPT trucks are designed for deep pushes in tough geologies and easy maneuverability over difficult terrains.

These CPT push systems range in push force from 15 tons up to 30 tons. (light, medium and heavy)

Less Setup - Quickest Results
The hydraulic leveling system provides rapid leveling of the unit once it is on site. This, coupled with the weight of the vehicle, enables soundings at greater depths, which frees the operator to spend more time on actual soundings and less time deploying and recovering anchors. The truck based CPT has the largest work platform available and permits a wide range of body styles and layouts.

Deepest Possible CPT Soundings
Vertek geotechnical heavy cpt trucks normally are equipped with 30 tons of push force and can be ballasted to achieve reaction weights required to utilize maximum push force. Additional push force can be supplied.

CPT Industry's Most Cost-Effective Configurations
Vertek Geotechnical became the world's leading geotechnical and environmental engineering manufacturer of heavy cpt push platforms by building on a number of different models to meet your specifications.

Customer reviews

No reviews were found for Vertek - Truck Based CPT Push Systems. Be the first to review!