Aker Clean Carbon‘s custom-built mobile test capture facility has been in operation since the autumn of 2008. The prime objective for the Mobile Test Unit is to provide operational data from reliable field tests. The plant will capture CO2 from different industrial flue gases and is equipped with advanced monitoring systems. The facility will verify new design features and solvents, and operate in an industrial environment during long-term testing.
-
Most popular related searches
The facility is designed for easy transport and ho...
The facility is designed for easy transport and hook-up, which means it can be transported to different sites.
The first destination for the capture facility was the gas research centre in Risavika outside Stavanger in Norway. The MTU was moved to Longannet in Scotland (UK) in the first half of 2009. This was the first time it was performing tests on a coal-fired power plant. In June 2011, the MTU moved to Alabama, US where it will be performing test campaigns at the National Carbon Capture Center (NCCC), hosted by Southern Company.
Customer reviews
No reviews were found for Mobile Carbon Capture Test Unit. Be the first to review!