Ideal Solutions Company Limited
Since more than two decades our company has been involved in treating both domestic and industrial waste water. Our engineering knowledge was confined to the waste water treatment by the conventional activated sludge method. In the year 2008, Turkey, being a candidate for the European Community`s membership, was officially requested by the Union to renew and/or upgrade all its waste water treatment facilities to comply with the EEC environmental regulations. Since then ,almost all the new activated sludge WWTP`s were planned on national scale with massive budgets and capacities, seeing no future for our company in this field we decided to quit the business of building new treatment plants using the classical activated sludge process and focused our attention on the MBBR(Moving Bed Biological Reactor) and MBR (Membrane Biological Reactor) processes instead .
Company details
Find locations served, office locations
- Business Type:
- Manufacturer
- Industry Type:
- Water Treatment
- Market Focus:
- Internationally (various countries)
About Us
The MBBR process is extremely important when a minimum footprint and maximum performance is sought specially for highly congested urban or remote rural areas. MBBR process is also vital when upgrading and /or improving the performance of existing Waste Water Treatment Plants is required.The MBR process on the other hand is indispensible when waste water to be treated is contaminated with non organic pollutants, waste water of chemical industries, hospitals, pharmaceuticals and many other heavy industries are typical examples for MBR applications. Our company is now working exclusively with MBBR and MBR processes and offers the following services:
Building state of the art new Waste Water Treatment Plants running with capacities ranging from 25m³/day - 1200 m³/day
The Plant
Our plant is located at Marmara Recycling Industrial Zone- Çayırova – Izmit . The location of the plant was carefully selected to be as close as possible to the Ship Building yards. Being close to the ship building industry gives us an easy Access to the highest quality steel plates with largest dimensions. We us up to 12 meter long and 3 meter wide steel plates in fabricating our MBBR tanks . The larger the size of the plates used the least welding joints are needed and the more durable the steel tank becomes. To handle the large size plates and the fabricated tanks easily 2 X10 tons ceiling hung rail tower cranes were installed. The cranes give us mobility and 360 access to perfect welding. Our welders and technicians are highly skilled since they are all recruited from the ship building industry.