Bay project, Escanaba, MI
PROJECT: Bay Project - Union Pacific RailroadLOCATION: Escanaba, MIPRODUCTS: Bulk Organoclay®, Reactive Core Mat® SEDIMENT REMEDIATION CHALLENGES: Near Escanaba, MI, engineers found a bay that was showing evidence of soluble organics (NAPL) on its surface which was threatening the nearby fresh water bay. A reoccurring sheen was developing on the surface in which local contaminated groundwater ...
By CETCO
-
Case study - Reactive barrier wall project update
Reactive Barrier Wall solves space and on-going activity problems during remediation project “Name Removed”, was contracted to install a passive reactive barrier wall in “Name Removed”. The wall was designed to remediate groundwater containing tetrachloroethylene (TCE). What made this job unique was the site location. Installation would occur in an operating commercial ...
-
Activated carbon filled reactive mat chosen as low profile permeable capping remedy case study
Project: Zidell Marine Corporation Sediment Cap Location: Portland, OR Products: Reactive Core Mat filled with Granular Activated Carbon (GAC) and Apatite II Background: Cleanup is required for land which was contaminated with a variety of chemicals as a result of ship construction, ship breaking, and barge construction at a site where heavy industrial use dates back to the early 1900s. In ...
By CETCO