well pumping system Articles
-
Ontario Landfill Site - Case Study
A Texas based company with waste management sites around North America have installed electrical generation plants at various locations that use methane collected from the waste. The daily operation of these sites include the management of the leachate, a liquid waste by-product of decomposition, and the collection of gas for electricity production. This is typically carried out at multiple wells ...
-
National Grid, Croydon case study
Morgan Est Contractors for National Grid Supply and installation of telemetred groundwater monitoring network, May 2006 - ongoing Hydro-Logic recently completed the supply and installation of borehole instrumentation and a telemetry monitoring system to monitor groundwater conditions in 28 observation wells located at 19 sites in the vicinity of Croydon. The project was required to ensure ...
-
National Grid, Croydon case study
National Grid, Croydon Morgan Est Contractors for National Grid Supply and installation of telemetred groundwater monitoring network, May 2006 - ongoing Hydro-Logic recently completed the supply and installation of borehole instrumentation and a telemetry monitoring system to monitor groundwater conditions in 28 observation wells located at 19 sites in the vicinity of Croydon. The project was ...
-
Groundwater Contamination Plume Remediation - Case Study
19 CMT Multilevel Systems Successfully Installed in Challenging A facility in Pontypool, Wales, UK was once the location of a plastic forming plant. Over time, chemicals produced through the plastic forming processes were lost into the groundwater beneath the facility, creating a large contaminant plume. Years later it was determined that the plume is migrating off site. In order to intercept ...
-
Quarry dewatering compliance - Case Study
Louis W. Bray Construction installed a Greyline Area-Velocity Flow Meter in 2009 to meet Ministry of Environment regulations. Their permit stipulated effluent limits plus monitoring, sampling and flow measurement of wastewater discharged from the site to the South Raisin river. The Ontario Water Resources Act requires flow monitoring for any quarry dewatering greater than 50,000 liters per day. ...
-
Quarry Dewatering Compliance - Case Study
Louis W. Bray Construction installed a Greyline Area-Velocity Flow Meter in 2009 to meet Ministry of Environment regulations. Their permit stipulated effluent limits plus monitoring, sampling and flow measurement of wastewater discharged from the site to the South Raisin river. The Ontario Water Resources Act requires flow monitoring for any quarry dewatering greater than 50,000 liters per day. ...
-
Water Flow Monitoring Helps Avoid Costly Fines
Water Distribution Company Refines Pumping System Many water distribution companies use a similar process for Water Flow Monitoring: Collect water from a well with the help of water pumps, utilize a pond or reservoir to temporarily store the water and maintain a loading center to fill water trucks for transport. The problem is how to pump the maximum allowable volume of water on a day-to-day ...
-
Groundwater Monitoring with the Waterra Inertial Pump
Untitled Document Abstract The Waterra Inertial Pump has been available for use in narrow diameter monitoring wells for several years. This device offers many advantages over other types of sampling equipment. Since this pump operates via a principle not used by any other type of device and is commonly constructed of materials not widely used in field sampling, some ...