Directional Drilling Video

Rating has been disabled

Installation of directional borings is completed in four stages that are as follows:

  • 1st Stage – Pilot Hole  - A pilot hole is horizontally drilled  and continues under and across the obstacle along a predetermined design path. An electronic transmitter is placed in a housing which is directly behind the directional drilling cutting head. The transmitter sends a signal to the surface which is read by the receiver

Reviews disabled

Reviews have been disabled for Directional Drilling Video.