ARM Ltd.

Time Lapse of the Construction of 1 of 16 Sludge Treatment Reed Bed Basins Video

ARM Group Ltd designed the worlds first drinking water sludge treatment reed bed. Covering 6 ha, the reed bed dewaters the sludge produced during the drinking water treatment process and is operated by Essex and Suffolk Water.

This is a Time Lapse video of the construction of one of the 16 wetland basins by contractors CA Blackwell.

(c) ARM Group Ltd 2013 // www.armgroupltd.co.uk

Customer comments

No comments were found for Time Lapse of the Construction of 1 of 16 Sludge Treatment Reed Bed Basins Video. Be the first to comment!