Yogurt plant - Case study
User: Yogurt Manufacturing Plant Materials: Returned and rejected products, in-plant wet waste Before Installation Of Extruder MONTHLY WASTE VOLUME: 28 loads, 38 cubic yards each. Average of 10 tons per load. MONTHLY EXPENSE – HAULING & TRANSPORTATION: $20,000.00 This plant was utilizing a 38 yard self-contained compactor / container which was being emptied on a daily basis. ...
-
Project profile - confidential client environmental remediation project Delray Beach, Florida
Background Levine Fricke Engineers (LFE), an environmental firm under contract to Blackstone Consultants LLC (Blackstone), was responsible for specifying and selecting a cleanup remedy for a former contaminated nursery site located in Delray Beach, Florida. LFE and Blackstone performed site characterization and demonstrated that site groundwater contained very high arsenic concentrations. ...