well water system News
-
New water well hooked up in Bally; residents no longer need bottled water (PA)
The U. S. Environmental Protection Agency announced today that a new drinking water well has been hooked up to the Bally Borough public water system, and that residents no longer have to rely on bottled drinking water. A contractor has been supplying about 1,000 residents with bottled water since 2003 because the Bally water system was contaminated with an industrial solvent, 1,4-dioxane, that ...
-
Kent Based firm C&M Plant put their new Scarab Mistral to work on the Lee Tunnel Project
Kent based firm C&M Plant have recently taken delivery of a new Scarab Mistral road sweeper. The machine will be spending the first part of its life working on the Lee Tunnel project in South East London. The £635m tunnel will tackle discharges from London’s largest CSO at Abbey Mills Pumping Station in Stratford. The four-mile tunnel will run beneath the London Borough of Newham ...
-
Kent Based firm C&M Plant put their new Scarab Mistral to work on the Lee Tunnel Project
Kent based firm C&M Plant have recently taken delivery of a new Scarab Mistral road sweeper. The machine will be spending the first part of its life working on the Lee Tunnel project in South East London. The £635m tunnel will tackle discharges from London’s largest CSO at Abbey Mills Pumping Station in Stratford. The four-mile tunnel will run beneath the London Borough of Newham ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you