Waste Gas Articles

  • Biological desulphurization of Landfill biogas - Case study

    Summary Biorem's biogas desulphurization product is providing very high removal efficiencies at a landfill site in Quebec. Despite the highly variable concentrations and low winter temperatures, the system has achieved an average removal efficiency of 97%, and has maintained outlet nydrogen sulphide concentration below target consistently. As a result, the customer has realized a ...


    By Biorem Technologies Inc.

  • How can lead be so crucial, but also so toxic?

    Why is everyone talking about lead? Not long ago, like so many historic buildings in the UK, a local parish church near to where I live had the lead stolen from its roof.  Sadly, this is not so unusual and all the more distressing in this case, both because it holds special memories as the church where my wife and I were married, and also because the lead was stolen during heavy ...

  • Recycling Energie AG (CHE) Disposal Company - Case Study

    Digester:  2x 2.000 m³ Post digester: 2 x 2.600 m³ Gas storage: 2 x 930 m³ Input substrates: manure, grass cuts, food waste Scope of services:  concept creation, consulting, detail engineering, delivery of equipment, general project supervision, start-up, operational support and service Start-up: ...

  • CS Bioenergia (BRA) Disposal Company - Case Study

    Digester: 2 x 5.000 m³ Post Digester: 3.400 m³ Gas storage: 3.250 m³ Input substrates: primary and secundary sludge, food waste Scope of services:  concept creation, consulting, detail engineering, delivery of equipment, general project supervision, start-up, operational support and service Estimatet completion date: ...

  • SIF Oregon (USA) Disposal Company - Case Study

    Digester: 2 x 3.500 m³ (hydraulic digester) Post digester: 3.000 m³ Gas storage: 1.800 m³ Input substrates: vegetable waste,potatoes, pumpkin, maize waste Scope of services:  concept creation, consulting, detail engineering, delivery of equipment, general project supervision, start-up, operational support and service Start-up: ...

  • ERC (DEU) Disposal Company - Case Study

    Digester: 650 m³ (hydraulic digester) Gas storage: 280 m³ Input substrates: food waste Scope of services:  concept creation, consulting, detail engineering, delivery of equipment, general project supervision, start-up, operational support and service Start-up: 1996 / reconstruction ...

  • Jakob Bösch AG (CHE) Disposal Company - Case Study

    Digester: 3 x 1.650 m³ Post digester: 990 m³ Gas storage: 2.100 m³ Input substrates: manure, food waste, slaughterhouse waste Scope of services:  concept creation, consulting, detail engineering, delivery of equipment, general project supervision, start-up, operational support and service Start-up: ...

  • Case study - HMS Ocean Waste Incinerator

    Ship's Waste Incinerator This installation is Glosfume's first filter to be used at sea. Stringent laws prevent ships from dumping waste at sea, all waste has to be returned to its point of origin. The Royal Navy is one of the first to install an incinerator and filter onboard a ship. Extensive testing was carried out before fitting the unit to HMS Ocean; installation involved cutting a ...


    By Glosfume

  • Why is Energy-from-Waste slow to catch on in the U.S.?

    Nithin Coca reports in TriplePundit that Energy-from-Waste (EfW) is growing fast in Europe and parts of Asia. But it’s relatively stagnant here in the United States. In fact, the percentage of waste we burn for energy is actually slightly down in the past five years. What’s holding the U.S. back from this potentially sustainable solution? This stagnation is even more ...

  • A solution to fracturing water supply and disposal issues

    “Water, water, everywhere, Nor any drop to drink.” –The Rime of the Ancient Mariner, Samuel Taylor Coleridge Many topics of conversation among oil and gas industry professionals are predictable – oil price trends, the “great shift change” imperiling the available workforce, and production quotas and caps from OPEC. Yet one pressing topic among those developing ...


    By Fairmount Santrol

  • How TD and Bullfrog Power collaborated on an innovative green energy initiative - Case study

    In November 2016, Bullfrog Power and TD Bank Group launched a first-of-a-kind renewable energy collaboration, encompassing the full suite of Bullfrog’s renewable energy products – ...


    By Bullfrog Power Inc.

  • Waste materials are an underused resource the construction of Europe`s roads

    Recycled waste material could play a major role in the construction of roads in Europe, bringing both environmental and economic benefits. A new study proposes a scenario where 50% of the asphalt for Europe's roads consists of recycled materials, leading to significant reductions in costs, energy use and greenhouse gas emissions. According to the European Waste Framework Directive, there is a ...


    By European Commission

  • Idaho National Laboratory (INL) Advanced Test Reactor (ATR) - Case Study

    TRA-63 (TRA-605 Warm Waste Line) Failure of Underground 4-Inch Radioactive Warm Waste Pipe and Leakage Discovered During Waste Piping Replacement Construction Project Quick Facts: Pipe Material: Duriron Pipe Pipe Diameter: 4 inches Hole Size: ...


    By InduMar Products, Inc.

  • Using Air Strippers for Off-gas Treatment - Case Study

    Two pharmaceutical plants in Puerto Rico used large sequencing batch reactor (SBR) systems to treat their wastewater. The primary treatment was an aerobic bio breakdown of the waste. The were forced to change their treament process because of change in treatment regulations. The new regulations required them to treat off-gas that was coming from the SBRs. They were faced with installing a very ...


    By QED Environmental Systems

  • Case study - Agiba Gas Power Generation

    Proserve has recently carried out a power generation project with Agiba Petroleum Company in the western desert of Egypt to utilize the waste free flare gas instead of the very expensive fossil diesel fuel to power the oil production wells ‘pumps. The project faced several technical challenges. The associated gas has a low methane number” less than 45”,  which necessitated ...


    By ProServe Egypt

  • DAF Retrofitting with GEM LSGM Technology - Case Study

    Introduction Clean Water Technology, Inc. (CWT) is the creator of the Gas Energy Mixing (GEM) System - the most advanced primary treatment system on the market. As an alternative to replacing existing Dissolved Air Flotation (DAF), CWT introduces “DAF RETROFITS” utilizing innovative GEM Technology to provide superior reduction of total suspended solids (TSS), biological and ...


    By Clean Water Technology, Inc.

  • The ManureEcoMine pilot installation: advanced integration of technologies for the management of organics and nutrients in livestock waste

    Manure represents an exquisite mining opportunity for nutrient recovery (nitrogen and phosphorus), and for their reuse as renewable fertilisers. The ManureEcoMine proposes an integrated approach of technologies, operated in a pilot-scale installation treating swine manure (83.7%) and Ecofrit® (16.3%), a mix of vegetable residues. Thermophilic anaerobic digestion was performed for 150 days, the ...


    By IWA Publishing

  • Case study - Upgrading highly loaded waste ponds to “Bio-Gas Banks”

    Problem: Un-covered anaerobic systems can generate significant amounts of odors and renewable energy in the form of methane. The sulfides and methane are lost to the atmosphere due to lack of an impermeable barrier. If the basins were covered, the biogas could be captured, burned and converted to electricity and odors contained. A Missouri project, believed to be the largest and most ...

  • Case study - Veolia MPPE technology, Inpex Ichthys LNG - Australia

    Inpex Ichthys Project, Browse Basin, 220 km of Western Australia 8.9 million tons LNG/year; 1.6 million tons LPG/year; 100.000 barrels Condensate/day. Central Processing Facility on Semi-Submersible Platform separates Condensate and Gas. Gas is sent by pipeline to Darwin. Condensate is stored on FPSO. The MPPE unit is located on the FPSO. ...

  • How to make your waste disposal process pay for itself

    Incineration waste to energy means you can get FREE HEAT! It’s true to say that the first priority of any of the industrial waste incinerators we design and manufacture is to provide an efficient, cost-effective, environmentally responsible and legally compliant waste disposal system. ...


    By Todaysure Matthews

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you