waste processing installation Articles
-
Hilton Hotel Athens - Case study
BACKGROUND The prestigious Hilton Hotel located in the chic Kolonaki district of Athens, is a 508 bedroom site with conferencing, spa and roof top bars. Boasting magnificent views of the Acropolis and Mount Lycabettus the site also offers unique catering to match, with fresh Agean fish served at the Milos restaurant, roof top BBQ’s from the Galaxy Bar for scenic sunset eating, to ...
-
World leader in the key technology areas of heat transfer, separation and fluid handling looking to increase revenues by 40%
Situation: The world leader in the key technology areas of heat transfer, separation and fluid handling had set a goal to increase revenues by 40% in an overseas manufacturing plant. In order to achieve this business objective, it was critical to increase the coating capacity in the manufacturing process. Due to limited available floor space and the need to optimize material flow, adding ...
-
Vented air filtration protects employees and reduces downtime – Case Study
World leader in the key technology areas of heat transfer, separation, and fluid handling Situation A world leader in the key technology areas of heat transfer, separation, and fluid handling had set a goal to increase revenue by 40% in an overseas manufacturing plant. In order to achieve this business objective, it was critical to increase the coating capacity in the manufacturing process. ...
-
Monster 3-shred grinders helps reclaim food bank waste - Case Study
Multiple entities partner to divert food waste from landfills Problem: Food Composting system must breakdown mixed packaged waste for processing Solution: Low Speed, High Torque JWC 3-SHRED Grinder The statistics surrounding food waste in the United States can only be described as staggering. More than 30 percent of the food produced for human consumption in the United States, valued at ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you