water well pump Articles

  • Landfill pumps for Gas well dewatering - Case Study

    AutoPumps Keep the Power On for Thousands of Florida Homes Waste Management's Springhill Regional Landfill near Campbellton, Florida generates "green" energy by extracting and burning the methane in landfill gas. Its $7 million landfill gas energy (LFGE) plant, with six large Caterpillar engines running 24 hours a day, 7 days a week, is capable of producing 4.8 million watts of power. ...


    By QED Environmental Systems

  • Pump it up

    Aligning itself with a major equipment supplier and dealer helps the company access the tools and expertise it needs without risking too much capital. Aquatech is the distributor for Godwin Pumps of America in Ontario, Nunavut, Newfoundland and Eastern Labrador, all resource-rich territories. A recent purchase of Godwin by ITT Corporation has expanded the lineup of mine sector pumps. The company ...


    By Aquatech Dewatering Company

  • Pumps for new housing in Stockholm

    Grindex new series of dewatering pumps are designed to last three times longer in abrasive applications compared to previous pump generations. In this case study from Sweden, they are up for a tough test. One of the critical factors for the building of 3,000 new homes within a few years are the seven submersible dewatering pumps from Grindex installed deep in the bedrock below south Stockholm. ...


    By Grindex Pumps

  • Puny drain pumping station

    Bedford Pumps Ltd has recently completed the installation of the Mechanical and Electrical plant at a new pumping station at Puny Drain. The drain which is controlled by the East of Ouse, Polver and Nar IDB’s, drains an area of low lying land to the south of Kings Lynn. The recent redesign of the drainage system in the area necessitated the construction of a new drain and pumping station to ...


    By Bedford Pumps Ltd

  • Pumping Stations, Your Options

    There are many things to consider when thinking about pumping systems in developments, our Pumping Stations Manager talks through the options. Along with budgets, there are many factors to consider when choosing the right pumping station for a development, such as; Technical specifications – how much effluent is the pumping station going to need to remove? ...


    By T-T Pumps Ltd.

  • BA150 dewatering pumps at Panama Canal case study

    The Panama Canal is a 77.1-kilometre (48 mi) canal that connects the Atlantic Ocean (via the Caribbean Sea) to the Pacific Ocean. The canal cuts across the Isthmus of Panama and is a key conduit for international maritime trade. The size of the lock chambers at either end of the canal, the depth of the water in the canal and the height of the “Bridge of the Americas” actually ...


    By BBA Pumps

  • Mine Dewatering - The real value of the pumps selected is in the support that comes with them

    Reliable Equipment Depends on Strong Dealer Support When referring to the mining industry, the use of a specialized pumping company that not only supplies equipment, but also understands and provides the support required can play an integral component to the success of a project. This is especially true when working in remote northern areas where down time, has serious schedule and cost ...


    By Aquatech Dewatering Company

  • Piedroba Dewaters Slurry, Returns Clean Water to Holmes Beach Canals

    This project was a successful application of a total cleaning system (TCS), where the particular type of solids of the sediments permitted the dredger to avoid the costly construction of a dredged material maintenance area (DMMA), or the transportation and tipping fees for a municipal landfill. The surface waters were cleaned in tandem, and contributed to a higher quality benthic environment in ...

  • Open Pit Modeling

    The Problem Open pits are a common method of mining in the world. The design of such pits requires the application of technologies from a number of fields. One of the common scenarios is that the bottom of the pit may possibly extend beneath the water table of the surrounding geo-strata. If this is the case then a suitable set of pumping wells must be designed in order to ensure that ...


    By SoilVision Systems Ltd.

  • Dutch Dewatering, a Dry Construction Site Revenue Model

    It was the spring of 2010 - during the establishment phase of BBA Pumps Inc. At the time, I went to visit several construction sites in the Netherlands to see how successful dewatering was being organized. Talk about a small country showing how great it can be! It was an absolutely eye-opening experience. The Netherlands is one of the most densely populated countries ...


    By BBA Pumps

  • Numerical simulation of drainage scenarios for lowering groundwater rise due to construction of a new barrage on the Nile River

    The government of Egypt constructed a New Naga Hammadi Barrage (NNHB) 3.6 km downstream of the Old Naga Hammadi Barrage (ONHB). Upon construction, the water level raised by about 0.5 and 4 m upstream and within the river reach between ONHB and NNHB respectively. In this paper, a two–layer groundwater model was built using MicroFEM to study the groundwater rising problem. The model was used to ...


    By Inderscience Publishers

  • Temporary Construction Dewatering Solutions

    Mention “dewatering” to anyone outside of the underground construction trade, and typically, with a blank stare, they’ll ask what is D-watering? Mention dewatering to anyone in the underground construction trade, and they’ll likely state that it is one of the most important phases in the project, as a well designed and installed dewatering system will allow them to ...


    By Griffin Dewatering

  • Channel Tunnel rail link - groundwater model of the basal sands and chalk

    ESI used a groundwater model of the basal Sands and Chalk underlying central London to assess the dewatering impacts of tunnelling as part of the construction of the Channel Tunnel Rail Link (CTRL). A number of boreholes were to be installed for dewatering purposes whilst the tunnel was being driven.  Due to access constraints, the selection of borehole locations was difficult.  The ...

  • Aggressive dewatering aids concrete rehab at Abitibi

    An enormous volume of water passes through the Abitibi Canyon Generating Station every hour of every day. In order to complete critical concrete repairs on the hydro power station, general contractor The Barclay Construction Group needed to find a way to pump and discharge almost 30 million gallons of water in a 500-metre section of the river upstream from the station in under 30 hours. Aquatech ...


    By Aquatech Dewatering Company

  • PT150 hits the Riga Airport case study

    Riga International Airport is the largest airport in the Baltic States. RIX Airport acts as a hub for AirBaltic and is part of the network of a number of the largest airlines in the world. To ensure that the airport maintains it function of international access point for the Baltic states, the national Ministry of Transport has entered into an agreement to implement a development project with the ...


    By BBA Pumps

  • The Cambi Thermal Hydrolysis Process (THP) – dramatically improving sludge digestion and dewatering

    CAMBI MILESTONES 1990 - First development work following research work of Li and Noike 1995 – HIAS Norway – first full scale plant – still working very well after 11 years 1998 - 2002 rapid increase in projects, Denmark, England, Norway, Scotland, Japan, Ireland – new challenges and risks to be overcome 2000 - 2005 some problem solving ...


    By Cambi AS

  • Geotube Dewatering for Lagoon Sludge - Case Study

    Background In many animal waste management schemes it is desirable to separate solids from waste water and/or manures. In cooperation with the Department of Animal and Dairy Science, animal waste specialists from Biological and Agricultural Engineering are field testing a technology new to agriculture, to remove solids from lagoons. The test is currently being conducted at the UGA Dairy ...

  • Indoor Dewatering Plan Successful for Palm Beach Florida Mall

    Griffin Dewatering was hired to provide a workable dewatering plan to facilitate the“facelift” of a swanky mall in Palm Beach — all while maintaining a low profile to accommodate everyday mall business. When the Palm Beach, Fla., area was growing into the north end of the county, it became apparent that a new shopping venue was required. After all, these residents ...


    By Griffin Dewatering

  • Quarry Dewatering Compliance

    Louis W. Bray Construction installed a Greyline Area-Velocity Flow Meter in 2009 to meet Ministry of Environment regulations. Their permit stipulated effluent limits plus monitoring, sampling and flow measurement of wastewater discharged from the site to the South Raisin river. The Ontario Water Resources Act requires flow monitoring for any quarry dewatering ...


    By Greyline Instruments Inc.

  • Quarry dewatering compliance

    Louis W. Bray Construction installed a Greyline Area-Velocity Flow Meter in 2009 to meet Ministry of Environment regulations. Their permit stipulated effluent limits plus monitoring, sampling and flow measurement of wastewater discharged from the site to the South Raisin river. The Ontario Water Resources Act requires flow monitoring for any quarry dewatering greater than 50,000 liters per day. ...


    By Greyline Instruments Inc.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you