Drain Inspection Articles

  • Ovivo Double Entry Drum Screens at Yellow River WRF, Gwinnett County, GA – Customer Testimonial

    “We completed the Yellow River WRF Improvements Project in 2012. This project replaced an aging 14.0 MGD conventional activated sludge facility with an advanced 22.0 MGD MBR facility. The MBR facility includes third party submerged fiber membrane for solids separation. The membrane manufacturer required, at a minimum, 2mm screening to protect the .04 micron membrane. We decided to purchase ...

  • Woodside goodwyn - treating flushing fluid

    Client: Woodside Goodwyn During a scheduled shutdown on the Goodwyn platform, Woodside contracted CETCO Oilfield Services to treat the fluid generated during a flushing operation on the Goodwyn West Alpha condensate (water) stripping column T-100 and, install a permanent CETCO adsorption OIW (Oil in Water) package. During the shutdown of the Goodwyn platform, the vessel was drained, purged ...

    By CETCO Energy Services

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you