make-up water treatment Articles
-
Lahti, Finland Project - Case Study
Lahti Energia in Finland is now building a new 150 MW biomass fired boiler. For this project Radscan shall deliver complete condensation plant including combustion air humidification, condensate polishing and make-up water treatment. Montage start in February 2018, takeover in January ...
-
Power Plant Improves Operating Efficiency with Culligan Matrix Solutions
Challenge A large chemical manufacture was challenged with boiler tube failures in its power plant, resulting in costly repairs and down time. The boiler tube failures were a result of the incoming water quality to the power plant. Until recently, the boiler make-up water was treated with a combination of carbon media filtration and softening. As a result less than 50% of condensate was returned ...
-
Automotive: tyre washing - Case Study
THE CLIENT The Client is a multinational company, world leader in the production and sale of tyres. Worldwide, it counts around seventy plants manufacturing 180 million tyres each year that are sold in 170 countries. ...
-
Data Center Design & Planning - Introduction
Many businesses operate outside of safe capacity thresholds with little or no room to expand. According to the IDC, the average data center is 9 years old. However, Gartner states that any site more than 7 years old is obsolete. Overcrowded or obsolete data centers create a roadblock for growing organizations and building a new data center(s) is sometimes the only solution. While speed-to-market ...
By AKCP