Customer / Type of customer Ile Charlemagne Leisure Centre Orléans Métropole- FRANCE Issue / Need In 2019, Orléans launched a project to redevelop the Île Charlemagne leisure centre’s lake, with the aim of cleaning up a large part of the sediment that has accumulated there. For technical and environmental reasons, they opted for a hydraulic dewatering system ...
Russell Wennerstrom Senior Project Manager In 2010, E.P. Doyle & Son in Wheaton, IL, was called upon for a dewatering job for a mitigation and renovation project at Northside Park. Over the years, a lake at the park had silted up. “The ultimate goal of the project was to restore the park to the original condition when it was built back in the 1930s,” says Russell Wennerstrom, ...
Watr’s technology can be utilised in a variety of different environments around the world, we can install Watr in lakes, rivers and reservoirs as well as other large open expanses of water. The Case Studies below are examples of how Watr can be used to solve real world problems and how it’s technology could be preventative to future devastating events. The Highbridge Lake Fishery in ...
Switzerland spends more than $200 million annually to combat littering, but this year its cleanup efforts feature a new type of rubbish: discarded face masks used for COVID-19 protection. When Let’s Do It Switzerland joined the annual World Cleanup Day event in September, the more than five tons of garbage collected by more than 1,000 volunteers included more than 500 masks. More than 100 ...
In a previous blog post, we explored the importance of measuring dissolved oxygen (DO) levels during the late winter and early spring, particularly after a late snowfall. The decreased DO levels which accompany cold temperatures and snowed-over surfaces can stress fish populations, sometimes to the point of winterkill. Summer, at the other end of the weather and temperature spectrum, can also ...
The Challenge: In recent years Golden Algae has become a growing problem, causing fish kills and aquatic health issues in the fall and winter. Chemical management through the use of copper sulfate is not very effective even in the short term. In the long term, copper sulfate is toxic to many of the beneficial aquatic algae, bacteria and protozoa that can potentially compete with the golden ...
ERC was hired as the General Contractor to complete the restoration of the Minerva Park Lake Dam. The scope of work included dewatering a 6 acre lake. Demolition of outfall and lake structures, excavation of 6,000 tons of soil and the installation of chimney drain across the entire face of the dam. ERC also installed a cast-in-place concrete outfall & downshoot, lake drain structure & ...
For many years, our well-known oil spill response equipment has been marketed under the segment name Oil Spill Response. However, due to our strong commitment in relation to removal of plastic waste and marine debris from rivers and tributaries and removal of seaweed from beaches, we want to position ourselves as a strong environmentally conscious partner showing consideration for our ...
SolarBees continue to provide water quality benefits more than 10 years after deployment. Topics: cyanobacteria, odor control, effluent storage basins, irrigation, reservoir circulation. Reservoir Overview: Effluent storage basins used for irrigation. Pond #4: ~36 Surface Acres Pond #5: ~29 Surface Acres. Pre-Deployment Conditions: This location had a history of cyanobacteria ...
Long-term cyanobacteria (blue-green algae) and odor control achieved. Topics: cyanobacteria, blue-green algae, odor control, effluent storage basins, irrigation Basin Overview: Two effluent storage basins of similar size and depth. P1 Area: 3.6 acres P2 Area: 3 acres Max Depth: 8 feet Each basin receives 1.2 MGD of effluent from the WWTP which then recharge water reclamation facilties ...
SolarBee circulation is proven to be an effective long term water quality solution eliminating the use of copper sulfate completely from this reservoir. Topics: raw water, cyanobacteria, blue-green algae, cyanotoxins, copper sulfate Reservoir Overview: Small 3.5 acres drinking water reservoir with a depth of 20 feet. Pre-Deployment Conditions: This reservoir experienced water quality issues ...
SolarBees continue to provide long term cyanobacteria control and water quality benefits. Topics: cyanobacteria, blue-green algae, macrophytes, lake circulation, irrigation, water clarity, municipal park Reservoir Overview: This two-basin lake is part of a municipal park system and is primarily used for recreation. It also serves as an irrigation source for the park itself and an adjacent golf ...
Topics: Lake, blue-green algae, taste and odors, aquatic weeds, water clarity Overview: This is a 6-acre lagoon with a single, narrow inlet connection to the approximately 1200-acre Lake. Maximum depth in the lagoon is about 7 ft. The lagoon also receives stormwater drainage from a county ditch. Both the lake and lagoon are primarily recreational. Conditions / Objectives: The Lake Association ...
Better raw water quality results in significant treatment savings and a fast pay-back. Topics: raw water, cyanobacteria, cyanotoxins, taste and odor, treatment savings, improve fishery, water clarity Reservoir Overview: This lake is an 850+ acre manmade reservoir feeding a County operated water treatment plant (WTP) in Georgia. The WTP production capacity was ten (10) to twelve (12) million ...
SolarBee continues to provide long term water quality benefits over a decade after deployment. Topics: cyanobacteria, blue-green algae, taste & odor, raw water reservoir, lake circulation. System Overview: This reservoir receives its water from a local river and serves as the primary raw water source for a municipal potable water treatment facility. Surface Area: 3.2 hectare (8 acres) ...
Heather AugustynPost-Tribune Marina one of five to be honored An effort to keep Lake Michigan and surrounding areas friendly to the environment by a Portage marina has earned it a state honor. Marina Shores Marina has been named a "clean marina" by the Indiana Department of Environmental Management because of its water protection efforts and protection of aquatic habitats. Marina Shores, a ...
The PPP project of Yulin Lake Lake Ecological Environment Protection in Jiujiang City was listed as the first batch of government and social capital cooperation demonstration projects by the Ministry of Finance in December 2014, with a total investment estimated at 1.32 billion yuan. The project includes water source protection, watershed pollution control, ecological restoration protection, ...
Construction Date: Fall 2012 Location: Bras d'Or Lake, Cape Breton NS Category: Sand Wand™ Habitat Restoration Irish Cove Brook is located on the southeastern side of the Bras d’Or Lake, Cape Breton NS. The lower reaches of the stream are downstream of the #4 Trunk Highway, flowing through an old limestone pit that was reclaimed several years ago; the stream was not restored. ...
In June 2015 the first European Games will be held in Baku, Azerbaijan. Eijkelkamp Soil & Water is supplying and installing equipment which will monitor the water quality and water quantity in Lake Boyuk Shor, to the north of the city, after the European Games. Part of a major remediation project The delivery and installation of the water quality and water quantity equipment by Eijkelkamp ...