organic biomass treatment Articles
1 articles found
-
Performance of membrane bioreactor to different hydraulic shock loadings
A Membrane Bioreactor (MBR) treating simulated sewage was operated and stabilised for a period of 60 days at an organic loading rate of 3.6 g/COD/day and Hydraulic Retention Time (HRT) of 8 h, during which the MBR showed 95% removal of Chemical Oxygen Demand (COD), 98% removal of Total Organic Carbon (TOC) and TSS, 91% removal of Total Kjeldahl Nitrogen (TKN) and 30% removal of phosphate. The ...